Skip to content

CERC · Central Electricity Regulatory Commission

Appointment of Consultants (Fifth Amendment) Regulations, 2024 — Explanatory Memorandum

Explanatory Memorandum to Central Electricity Regulatory Commission (Appointment of Consultants) (Fifth Amendment) Regulations, 2024

Explanatory memorandum to a draftReleased with the notice dated 27 Aug 2024

Draft

The draft has since been finalised as the Appointment of Consultants (Fifth Amendment) Regulations, 2025.

Explanatory memorandum to the Appointment of Consultants Regulations, 2008 — Fifth Amendment, 2024 — Draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is CERC's explanatory memorandum accompanying its draft (Appointment of Consultants) (Fifth Amendment) Regulations, 2024. It sets out four heads of change to the Commission's own consultant-engagement framework, which presently rests on the 2008 Principal Regulations — themselves a repeal and replacement of the 1999 Regulations (p1).

Section 1 gives the background and the two stated aims: strengthening the Commission's research and analysis capability, and rewarding efficient performance by its staff consultants (p1).

Section 2 proposes separate provisions for engaging academic and research institutions/organisations as consultants, to sit alongside the existing framework for corporate consultants, so that external research capacity can support the Commission's regulatory work under the Electricity Act, 2003 (p1).

Section 3 proposes a performance-related variable fee for staff consultants, admissible only after the Commission finalises annual targets for the organisation, divisions and individuals, and flags that consultant fee ranges have not tracked the consumer price index (industrial worker) since 2014 (p1).

Section 4 proposes an enabling framework for procuring consultancy through single-source selection or nomination in exceptional or urgent situations, guided by Rule 194 of the General Financial Rules, 2017 (p1).

Standard name
Appointment of Consultants
Primary topics
Commission staff and members

Read with this

The regulation

Commencement notices and reasons

Other copies of these documents (4)

One more document belongs here and is not on Voltaic: a draft or notice on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document