Skip to content

CERC · Central Electricity Regulatory Commission

Appointment of Consultants Regulations, 2008 — Fifth Amendment, 2024 — Draft

Central Electricity Regulatory Commission (Appointment of Consultants) (Fifth Amendment) Regulations, 2024

Draft amendmentReleased with the notice dated 27 Aug 2024No. L-7/1/0S44(59)-CERC

Draft

A proposal that has since been finalised as the Appointment of Consultants (Fifth Amendment) Regulations, 2025.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a draft CERC notification proposing the Fifth Amendment to the Central Electricity Regulatory Commission (Appointment of Consultants) Regulations, 2008 (p1). It is made under section 91(4) read with section 178 of the Electricity Act, 2003, after previous publication, bears a blank date line, and is to take effect from the date of publication in the Official Gazette (p1).

The draft amends the Principal Regulations in four places. Paragraph 2 adds a new clause to Regulation 5 so that academic and research institutions/organisations become a recognised category under the principal regulation (p1). Paragraph 3 inserts Regulation 6B, which allows single source selection or consultancy by nomination in exceptional circumstances — continuation of earlier work, urgency, proprietary techniques or sole specialised expertise, and other specially justified cases in the Commission's overall interest (p1–2).

Paragraph 4 inserts Regulation 6C, a route for engaging academic and research institutions on regulatory research: the Commission may decide to engage one on a Secretariat proposal containing terms of reference and required experience; the Consultancy Evaluation Committee, with the Chairperson's approval, calls for Expression of Interest; a panel is prepared against eligibility and pre-qualification criteria, held for a fixed period with a possible extension, and panel members are selected for specific studies on the least cost method (p2–3).

Paragraph 5 inserts Regulation 8B giving individual and staff consultants a performance-related variable pay component, capped as a share of monthly fee, released six-monthly against pre-specified annual targets, with the rating procedure and targets left to a separate Commission procedure (p3). A closing note records the Gazette publication history of the 2008 Principal Regulations and the four earlier amendments (p3).

Standard name
Appointment of Consultants
Primary topics
Commission staff and members

Read with this

The regulation

Commencement notices and reasons

Other copies of these documents (4)

One more document belongs here and is not on Voltaic: a draft or notice on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document