Skip to content

MPERC · Madhya Pradesh Electricity Regulatory Commission

Madhya Pradesh Balancing and Settlement Code, 2023 — First Amendment, 2024

Madhya Pradesh Balancing and Settlement Code 2023 (First Amendment) [ARG-34(II)(i) of 2024]

Gazette copyDated 1 Aug 2024No. 1852/MPERC /2024/ dated the 1st August 2024

A Gazette copy of the Madhya Pradesh Electricity Balancing and Settlement Code, 2023 or of one of its amendments.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on mperc.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the first amendment by the Madhya Pradesh Electricity Regulatory Commission to the Madhya Pradesh Balancing and Settlement Code, 2023 (the 'Principal Code'). It is a short, surgical instrument: it does not restate the Code, it widens who the Code's reporting and settlement obligations fall on (p4).

The core change is a substitution. Wherever the Principal Code said 'Discom' or 'Discoms', the amendment swaps in 'Intra State Entity (Excluding RE Generators, Hydro Generators and Open Access Customers)'. This is done in Clause 6(2) (p4), and repeatedly through Clause 7 — sub-clauses (8)(i), (23), (23)(a), (23)(b), (24)(a)–(d), and the nomenclature and sub-clause (26)(e) (p4–6). Clause 7(15) gets a pure drafting fix, deleting duplicated words (p5).

Two changes go beyond find-and-replace. Clause 7(8)(i) is reworked so the settlement language refers to Regional Deviation Charges rather than total Deviation Charges, and to 'State Discoms and Regional Deviation Charges' rather than 'Discoms' (p4). Clause 7(23)(c) is wholly substituted with a new sub-clause on the summary of reactive charges payable or receivable by the intra-state entity, with a note that reactive energy rates come from the Commission's separate orders and, until then, from the IEGC (p5).

The exclusion carve-out is the point of the document: renewable energy generators, hydro generators and open access customers are kept outside these obligations. It comes into force on Gazette publication, which is not dated in the text (p4).

Standard name
Balancing and Settlement Code
Primary topics
Deviation settlement (DSM), Energy accounting and settlement, Power quality

Read with this

Commencement notices and reasons

2 more documents belong here and are not on Voltaic: 2 copies in another language.

Voltaic last read MPERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (4 pages). A document MPERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on mperc.in ↗

Report an issue with this document