Madhya Pradesh Electricity Balancing and Settlement Code, 2023 [RG 34 (II) of 2023]

CodeDated 22 Dec 2023No. 2896/MPERC/2023 dated 22nd December 2023

1 amendment to it is on Voltaic, dated 2 Aug 2024.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on mperc.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is MPERC's replacement for the Madhya Pradesh Electricity Balancing and Settlement Code, 2015: a full state-level Availability Based Tariff framework for intra-state scheduling, energy accounting, deviation settlement and reactive energy settlement. It is issued under the Electricity Act 2003 (notification No. 2896/MPERC/2023, Bhopal, 22 December 2023) and applies geographically to Madhya Pradesh, to all intra-state entities connected to the intra-state transmission network that sell or buy power within or outside the state (p1–2). Critically, it does not commence on issue: s.2(3) says it comes into force on a date to be notified by the Commission separately, and s.11 repeats that (p2, p24–25).

After definitions in s.3 (p2–7), s.4 requires each intra-state entity to build adequate infrastructure and directs SLDC to prepare detailed procedures — scheduling and despatch, metering, energy/deviation/reactive accounting and payment settlement, curtailment — within 30 days of notification (p7). Discoms must stand up Discom Energy Accounting Groups at Discom Control Centres to handle embedded open-access settlement (p8).

Section 5 sets the scheduling and despatch regime under the MP Electricity Grid Code, including time-block scheduling, apportionment of weekly transmission and distribution losses for net drawal schedules, the timetable for computing and applying weekly losses, treatment of abnormal-loss weeks, and publication and five-day verification of schedules (p8–10). Section 6 covers metering: who installs special energy meters and AMR, who bears cost, the weekly data-download and MRI fallback timetable, rounding conventions, a fifteen-day window to check computations, and how missing meter data is assessed (p10–12).

Section 7 is the operative core: it defines what the monthly State Energy Account must contain and how capacity/energy charges flow through MPPMCL; it creates the weekly State Deviation Settlement Mechanism Account and specifies the deviation-charge methodology by reference to CERC's 2022 DSM Regulations, with category-specific treatment for discoms, railways/SEZ, open-access customers, thermal generators, municipal-solid-waste plants and wind/solar; it sets the three-step pool-balancing procedure, payment timelines, late-payment surcharge and Letter of Credit requirements; and it creates the weekly State Reactive Account with five worked balancing cases and the reactive payment rules (p12–21). Section 8 points to the Appendix for the imbalance-settlement illustration (p22).

Sections 9–10 provide the data-archiving table and the Standing Committee for Market Audit (p22–24). Sections 11–14 state applicability, the Commission's power to remove difficulties, its power to amend, and the savings clause that expressly repeals the 2015 Code while preserving the Commission's inherent powers and its ability to depart from the Code (p24–25).

The Appendix (pp26–31) walks through the three-step pool balancing — pre-pool balancing of the three discoms against the regional DSM amount, then balancing of long-term intra-state entities excluding open-access customers, then inclusion of open-access participants and infirm-power injectors — using numeric examples with adjustment ratios.

The short title is Madhya Pradesh Electricity Balancing and Settlement Code, 2023 [RG 34 (II) of 2023], signed by Commission Secretary Umakanta Panda (p1, p25).

Standard name
Balancing and Settlement Code
Primary topics
Energy accounting and settlement, Deviation settlement (DSM), Scheduling and despatch

Read with this

Commencement notices and reasons

Other copies of these documents (1)

2 more documents belong here and are not on Voltaic: 2 copies in another language.

Voltaic last read MPERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (4 pages). A document MPERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of MPERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on mperc.in ↗

Report an issue with this document