Skip to content

MPERC · Madhya Pradesh Electricity Regulatory Commission

Madhya Pradesh Balancing and Settlement Code, 2023 — First Amendment, 2024

Madhya Pradesh Balancing and Settlement Code 2023 (First Amendment) [ARG-34(II)(i) of 2024]

AmendmentDated 2 Aug 2024No. 1852/MPERC /2024/ dated 02/08/2024

Amends the Madhya Pradesh Electricity Balancing and Settlement Code, 2023.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on mperc.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the first amendment to the Madhya Pradesh Balancing and Settlement Code, 2023, issued by MPERC as Notification No. 1852/MPERC/2024 dated 2 August 2024 (p1). It takes effect from the date of publication in the Madhya Pradesh Gazette, but the Gazette date is not printed in the text (p1).

The operative content is narrow and textual. Clause 2 rewrites Clause 6(2) of the Principal Code so that an obligation previously placed on "each Discom" falls instead on "each Intra State Entity (Excluding RE Generators, Hydro Generators and Open Access Customers)" (p1). Clause 3 carries the same substitution through Clause 7 — sub-clauses (23), (23)(a), (23)(b), (24)(a)–(d), and the nomenclature of sub-clause (26) and (26)(e) (p2–3) — recasts Clause 7(8)(i) to frame the settlement summary around Regional Deviation Charges and state Discoms rather than total deviation charges (p1), deletes a duplicated phrase in Clause 7(15) (p2), and replaces Clause 7(23)(c) with a new reactive-charge summary provision under which reactive energy rates await separate Commission orders, with IEGC rates applying meanwhile (p2).

In substance the amendment shifts the code's deviation, reactive-charge and reporting requirements from Discoms to Intra State Entities as a class, while expressly excluding RE generators, hydro generators and open access customers (p1–3).

Standard name
Balancing and Settlement Code
Primary topics
Deviation settlement (DSM), Energy accounting and settlement, Power quality

Read with this

Commencement notices and reasons

Other copies of these documents (1)

2 more documents belong here and are not on Voltaic: 2 copies in another language.

Voltaic last read MPERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (4 pages). A document MPERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on mperc.in ↗

Report an issue with this document