Skip to content

SSERC · Sikkim State Electricity Regulatory Commission

Standards of Performance for the Distribution & Transmission Licensee (Amendment) Regulations, 2024

Sikkim State Electricity Regulatory Commission (Standards of Performance for the Distribution & Transmission Licensee) (Amendment) Regulations, 2024

AmendmentDated 22 Jul 2024Published in the Gazette 22 Jul 2024No. 435/SSERC/2024-25/02 dated 22/07/2024

Amends a regulation Voltaic does not hold.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on sserc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a SSERC notification amending the Commission's 2012 Standards of Performance (SOP) Regulations for distribution and transmission licensees. It was issued and gazetted on 22 July 2024 and takes effect from that publication date (p1).

The first operative change replaces Regulation 1.5(A) of the Principal Regulations with a new compensation regime for distribution under-performance (p1–3). Compensation for failures listed in the APPENDIX becomes payable automatically, without a consumer claim; the licensee must build an online claim facility and an automatic compensation mechanism within set deadlines; eligibility is conditioned on bill payment history and on the consumer not having been convicted of theft or assessed for unauthorised use; and the payable amount scales up depending on whether the consumer must claim, represent, or succeed before the CGRF or Ombudsman. Compensation cannot be recovered through the licensee's ARR, and unresolved claims route to the CGRF under the 2012 grievance regulations (p3).

The second change inserts Regulation 3.9, requiring a centralised 24x7 toll-free call centre within a stated period and a common CRM system covering the listed consumer services, with alerts, status tracking, auto-escalation and reporting of manpower and capital expenditure at tariff filing (p3–4).

The third change inserts Regulations 5.10.1–5.10.3 defining SAIFI, SAIDI and MAIFI, the interruptions excluded from each, force majeure relaxation, and the disaggregation and monthly reporting duties of the licensee (urban/rural, circle/division/sub-division, agricultural feeders), with the Commission to notify target levels annually (p4–6). Appendix-AA supplies the load-based and consumer-based reporting formats (p7–8).

Standard name
Standards of Performance
Primary topics
Standards of performance, Consumer grievance redressal (CGRF), Electricity ombudsman

Read with this

Voltaic does not hold the regulation itself.

Proposed changes (drafts with no final yet)

Voltaic last read SSERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 21 Nov 2026. A document SSERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on sserc.org ↗

Report an issue with this document