Skip to content

SSERC · Sikkim State Electricity Regulatory Commission

Standards of Performance for the Distribution & Transmission Licensee — Second Amendment, 2026

Sikkim State Electricity Regulatory Commission (Standards of Performance for the Distribution & Transmission Licensee) (Second Amendment) Regulations, 2026

Draft amendmentDated 21 Sep 2026

Draft

A proposal, not law. Voltaic holds no final regulation made from this draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on sserc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the second amending instrument to Sikkim's Standards of Performance regime for distribution and transmission licensees. It extends to the whole State, binds distribution licensees, transmission licensees and electricity consumers, and comes into force on publication in the Official Gazette of Sikkim (p1).

Regulation 1 supplies the short title, extent and commencement. Regulation 2 inserts a proviso into Regulation 5.10.1 of the Principal Amending Regulations 2024 requiring the distribution licensee to compute and track SAIFI as the frequency of sustained outages per consumer per year, expressly tied to Rule 10 of the Electricity (Rights of Consumers) Rules, 2020 (p1). Regulation 3 does the parallel job for SAIDI in Regulation 5.10.2 (p1) and substitutes the first exclusion clause, fixing the minimum outage duration counted for either index at 3 (three) minutes, with anything shorter treated as a momentary outage and excluded (p2).

Regulation 4 inserts a new Regulation 5.10.4, which creates the governance layer around those indices: the Commission is to notify SAIDI and SAIFI targets annually for each distribution licensee, separately for urban and rural areas; the licensee must publish quarterly and annual reports of actual performance against those targets on its website; and non-compliance attracts compensation or penalty under the Electricity Act, 2003 (p2). The document is signed by order of the Commission, Secretary (p2). It changes measurement, reporting and target-setting mechanics, not the target values themselves.

Standard name
Standards of Performance
Primary topics
Standards of performance

Read with this

Voltaic last read SSERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 21 Nov 2026. A document SSERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on sserc.org ↗

Report an issue with this document