Standards of Performance for the Distribution & Transmission Licensee, 2012 — First Amendment, 2025

Sikkim State Electricity Regulatory Commission (Standards of Performance for the Distribution & Transmission Licensee) (First Amendment) Regulations, 2025

AmendmentDated 11 Aug 2025Published in the Gazette 12 Aug 2025No. 435/SSERC/2024-25/04 dated 11.08.2025

Amends a regulation Voltaic does not hold.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on sserc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

A two-page Gazette notification by the Sikkim State Electricity Regulatory Commission amending its 2012 Standards of Performance regulations for distribution and transmission licensees. It was issued on 11 August 2025 and published in the Sikkim Government Gazette on 12 August 2025, from which date it comes into force (p1). It extends to the whole State and applies to all distribution and transmission licensees and to consumers in Sikkim (p1).

Clause 2 inserts two new definitions into Regulation 1.2(1) of the Principal Regulations: 'Owner', and 'Resident Welfare Association' — an association of all property owners in a co-operative group housing society, multi-storied building, residential colony or similar body registered with the State Government (p1).

Clause 3 substitutes Regulation 4.4(1)(a) to (d), which governs the time frame for providing a new connection or modifying an existing one. The substituted text first defers to the relevant regulations of the Electricity Supply Code, then restates service-level time limits differentiated by area category — metropolitan, municipal, rural and H.T. connections — and a longer limit where supply requires extension of distribution mains or commissioning of a new sub-station (p2). Two provisos require the licensee to file the application receipt and a sub-station proposal for Commission approval, dispense with that approval where the sub-station is already in the Commission's approved investment plan, and bar erection of a sub-station serving an individual premises before charges and security deposit are paid. The new clause (c) carves out delays from right of way, land acquisition and compensation, and other delays not attributable to the licensees (p2).

There is no savings, transition or repeal clause; the effect is confined to two definitions and the connection time-frame regulation.

Standard name
Standards of Performance
Primary topics
Standards of performance, New connections and load changes

Read with this

Voltaic does not hold the regulation itself.

Proposed changes (drafts with no final yet)

Voltaic last read SSERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 21 Nov 2026. A document SSERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on sserc.org ↗

Report an issue with this document