Transmission Licensee's Standards of Performance Regulations, 2004

Rajasthan Electricity Regulatory Commission (Transmission Licensee's Standards of Performance) Regulations, 2004

StandardsDated 20 Apr 2004No. Secy / RERC/REG/ 24 - dated 20th April 2004

Replaced by Standards of Performance of Transmission Licensee Regulations, 2021

See that regulation for the date it took effect and for anything it keeps in force.

Saving clause of the regulation that replaces it: “Notwithstanding such repeal, anything done or any action already taken under the repealed regulations shall be deemed to have been done or taken under these Regulations.”

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on rerc.rajasthan.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

RERC issued these regulations on 20 April 2004 under s.57 read with ss.9, 33 and 34 of the Rajasthan Power Sector Reforms Act 1999, after consulting its Advisory Committee and other stakeholders (p1). They bind all transmission licensees — in practice RVPN — and fix the operational performance the licensee must deliver on the State Transmission System, with matching obligations on distribution licensees, RVUN and other users at interconnection points.

Regulations 1–3 give the title, application to all transmission licensees, commencement on Gazette publication, definitions, and the objective: minimum grid performance, a basis for users to design their equipment against the electrical environment, and progressive movement from national towards international standards (p1–2).

Regulation 4 is the spine of the document: standards are implemented in three stages — a one-year Preliminary Stage (Level 1), a Transition Stage of up to two years with investment (Level 2), and a Final Stage thereafter (Level 3) (p2). Most later standards are graded against these levels, and a few apply only in the Final Stage.

Regulation 5 sets system availability obligations, with a formula for hourly substation availability, exclusions for outages caused by SLDC emergency instructions, connection-condition breaches or distribution system faults, and a capacity-weighted aggregation across substations serving a distribution licensee (p2–3). Regulation 6 covers voltage: a voltage profile band for each nominal voltage at EHV substations monitored at SLDC, phase voltage unbalance limits (Final Stage only), the Voltage Variation Index formula and annual limits determined by RVPN, and a current unbalance limit with a 12-hour remedy window and referral to the Grid Code committee (p3–4). Regulation 7 covers frequency — operation as part of the Northern Grid, IEGC compliance, target and statutory frequency bands, and a Frequency Variation Index to be adopted as and when IEGC stipulations are implemented in the Northern Region (p4–5).

Regulation 8 treats reliability in three senses: system adequacy measured by loss of load expectation, n-1 security tested against a stepped import increase, and service reliability measured by SAIFI and SAIDI at EHV grid substations, excluding natural events, scheduled outages, load shedding and PGCIL/BBMB failures (p5–7). Regulation 9 sets harmonic distortion measurement and control, naming measurement standards, monitoring intervals, advance notice to RVUN and distribution licensees, and a register of harmonic-prone metering points (p7–8). Regulation 10 requires I.E. Rules safety compliance, designated control persons under the Grid Code, a licensee Safety Manual effective from the preliminary stage, and an Annual Review Committee reporting to the Commission (p8–9).

Standard name
Standards of Performance
Primary topics
Standards of performance, Transmission availability and outages, Power quality

Read with this

Voltaic last read RERC's website for final documents on 24 Nov 2026. A document RERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on rerc.rajasthan.gov.in ↗

Report an issue with this document