NERC · Nagaland Electricity Regulatory Commission
Rooftop Solar Grid Interactive System Net/Gross Metering Regulations, 2019
NERC (Rooftop Solar Grid Interactive System Net/Gross Metering) Regulations, 2019
RegulationDate not stated
2 amendments to it are on Voltaic, the latest dated 29 Mar 2025.
Summary
Summary written by software. Check the regulator's original before you rely on it.
The Nagaland Electricity Regulatory Commission's RTS Regulations, 2019 are the state's framework for connecting rooftop solar to the distribution grid under two distinct commercial arrangements — net metering and gross metering — and they replace the 2016 net-metering-only regulations (p5). The regulations bind the Distribution Licensee (Department of Power Nagaland), eligible consumers, and third-party owners who lease rooftops (p7).
Regulations 1-2 set commencement (gazette publication) and the definitional vocabulary: eligible consumer, net metering (self-consumption offset), gross metering (whole output sold to the licensee), third-party owner, RESCO, settlement period and interconnection point (p5-7). Regulation 3 fixes scope, and Regulation 4 lays down operating principles — anti-islanding, automatic synchronisation, harmonic limits, battery-backup isolation — plus the rule that a premises cannot hold both net and gross metering (p7-9).
Regulations 5-9 cover eligibility thresholds, MNRE-linked central financial assistance, vendor empanelment by the licensee or State Nodal Agency, a ceiling on rooftop solar capacity per distribution transformer, and a grid-connectivity application procedure to be framed and displayed later by the licensee (p9). Regulations 10-12 deal with interconnection standards, cost responsibility, metering (including mandatory check meters above a size threshold) and commissioning, which splits into two tracks above and at/below 10 kW (p9-11).
Regulations 13-14 are the commercial core: net-metering energy accounting (export/import, carry-forward credit within the financial year, time-of-day block matching, credit expiry at year end, continued payment of minimum charges, exemption from wheeling/cross-subsidy/banking charges, no deemed generation) and gross metering (licensee pays 'Solar Injection Compensation' at a Commission-approved feed-in tariff) (p11-13). Regulation 15 assigns the generation towards the licensee's solar RPO; Regulation 16 carves REC sellers out of these regulations entirely; Regulations 17-19 reserve powers of direction, relaxation and amendment to the Commission (p13-14). Annexure-I sets the technical/interconnection parameter table and Annexures II(A) and II(B) are the model net-metering and gross-metering interconnection agreements (p15-22).
Read with this
Amendments and corrections
Voltaic last read NERC's website for final documents on 1 Oct 2026. A document NERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of NERC's website on 1 Oct 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.