NERC · Nagaland Electricity Regulatory Commission

Rooftop Solar Grid Interactive System Net/Gross Metering Regulations, 2019 — Second Amendment, 2025

NERC (Rooftop Solar Grid Interactive System Net/Gross Metering) (Second Amendment) Regulations, 2025

AmendmentDated 29 Mar 2025No.NERC/REGN/T-15/2021 (Pt-II) dated March,'25

Amends the Rooftop Solar Grid Interactive System Net/Gross Metering Regulations, 2019.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on nerc.org.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

A two-page notification by the Nagaland Electricity Regulatory Commission amending its rooftop solar net/gross metering regulations. Issued at Kohima on 29 March 2025 under section 181 read with section 86(1)(e) of the Electricity Act 2003, after previous publication (p1).

The operative part (clause 2, p1) substitutes Regulation 13.7 of the NERC (Rooftop Solar Grid Interactive System Net/Gross Metering) Regulations, 2019 — the 'Principal Regulations'. The replacement clause provides that electricity credits left unadjusted at the end of a settlement period are treated as units purchased by the Distribution Licensee, priced at the rate proposed and recommended by the Department of Power, Government of Nagaland and approved by the State Commission. A proviso adds that cumulative carried-over injected electricity is reset to zero at the beginning of each settlement period (p1).

The rest of the document is procedural: signature by the Chairman and Deputy Director, and an endorsement list of State officials and departments, including a request to the Printing and Stationeries Department to publish the notification in the next Gazette (p1–2). No commencement clause or Gazette date is printed, and the clause does not itself state the settlement period, the rate, or the operative date.

Standard name
Net Metering and Rooftop Solar
Primary topics
Net metering

Read with this

Voltaic last read NERC's website for final documents on 1 Oct 2026. A document NERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on nerc.org.in ↗

Report an issue with this document