NERC · Nagaland Electricity Regulatory Commission

Rooftop Solar Grid Interactive System Net/Gross Metering Regulations, 2019 — First Amendment, 2024

Nagaland Electricity Regulatory Commission (Rooftop Solar Grid Interactive System Net/Gross Metering) (First Amendment) Regulations, 2024.

AmendmentDated 20 May 2024No.NERC/REGN/T-15/2021 (Pt-II) dated 20th May,'24

Amends the Rooftop Solar Grid Interactive System Net/Gross Metering Regulations, 2019.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on nerc.org.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a two-clause amendment by the Nagaland Electricity Regulatory Commission to its 2019 rooftop solar net/gross metering regulations (p1). Regulation 1 gives the short title and provides that the amendment takes effect from the date of its notification in the Nagaland Gazette (p1). Regulation 2 inserts two new clauses into Regulation 10.3 of the Principal Regulations, both about the technical feasibility study a distribution licensee carries out before a rooftop PV system is installed: clause (f) fixes a 15-day deadline for completing that study and makes the licensee's silence operate as deemed technical feasibility, and clause (g) removes the study requirement altogether for applications up to 10kW, deeming complete applications accepted and requiring the licensee to make any commensurate enhancement of the consumer's sanctioned load (p1). The Commission states it is acting in line with the Ministry of Power's Electricity (Rights of Consumers) Amendment Rules, 2024, and that a draft was previously published on 4 April 2024 (p1). Page 2 carries the Chairman's signature and the circulation list to state departments and the gazette printer (p2).

Standard name
Net Metering and Rooftop Solar
Primary topics
Net metering, New connections and load changes

Read with this

Voltaic last read NERC's website for final documents on 1 Oct 2026. A document NERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on nerc.org.in ↗

Report an issue with this document