CERC · Central Electricity Regulatory Commission
Terms & Conditions of Tariff Regulations, 2001
Central Electricity Regulatory Commission (Terms & Conditions of Tariff) Regulations, 2001
RegulationDated 26 Mar 2001Published in the Gazette 26 Mar 2001In force from 1 Apr 2001No. L-7/25(!)/2001-CERC dated 26th March. 2001
Replaced by Terms and Conditions of Tariff Regulations, 2004
See that regulation for the date it took effect and for anything it keeps in force.
Summary
Summary written by software, from pages 1 to 154 of 224. Check the regulator's original before you rely on it.
This is CERC's principal tariff regulation for the first control period after the ERC Act regime, gazetted 26 March 2001 and brought into force from 1 April 2001 for three years unless reviewed earlier or extended (p1, p118). It applies where CERC determines capital-cost-based tariff, with generation tariff fixed station-wise and transmission tariff line-wise/sub-station-wise then aggregated to regional tariff; new projects are filed at least three months before anticipated completion (p118–119). Chapter 1 also covers capital-cost staging, the 20% capex threshold for mid-period revisions, extra rupee liability, and tax escrow arrangements with beneficiaries (p119–120).
Chapter 2 is the thermal (including gas and naphtha) tariff chapter. It defines operational terms, then sets normative operating parameters: target availability for fixed-charge recovery, PLF-linked incentive threshold, gross station heat rate, secondary fuel oil consumption, auxiliary consumption, COD and stabilisation periods (p121–126). It then prescribes how fixed charges are built up — interest on loan, depreciation and advance against depreciation, return on equity, O&M expenses with escalation, and interest on working capital — and how variable energy charges, fuel price adjustment, incentives, tax pass-through and development surcharge work (p126–133). Later clauses deal with UI charges, rebate/late payment, scheduling in 15-minute blocks, demonstration of declared capacity, metering/accounting and monthly billing formulas (p133–139).
Chapter 3 does the same for hydro stations. It defines hydro-specific concepts (design energy, capacity index, deemed generation, saleable primary/secondary energy), sets hydro norms (normative capacity index, auxiliary consumption, transformation losses, COD), and provides for capacity charges, primary and secondary energy charges, incentives/disincentives, tax, development surcharge, UI, rebate/late payment and deemed generation (p140–152). The hydro scheduling clauses mirror thermal scheduling and add run-of-river versus storage dispatch rules.
Read with this
Amendments and corrections
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.