CERC · Central Electricity Regulatory Commission
Terms & Conditions of Tariff Regulations, 2001 — First Amendment, 2003
Central Electricity Regulatory Commission (Terms & Conditions of Tariff) (First Amendment) Regulations, 2003
AmendmentDated 1 May 2003Published in the Gazette 2 May 2003In force from 1 Apr 2003No. L-7/25(1)/2001-CERC. dated the 1st May, 2003
Replaced by Terms and Conditions of Tariff Regulations, 2004
See that regulation for the date it took effect and for anything it keeps in force.
Amends the Terms & Conditions of Tariff Regulations, 2001.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a short CERC amendment notification, issued on 1 May 2003 and printed in the Gazette of India (Extraordinary), Part III–Section 4, No. 65, dated 2 May 2003 (p1, p3). It amends the Central Electricity Regulatory Commission (Terms & Conditions of Tariff) Regulations, 2001 — the "Principal Regulations" — and is made under Section 28 of the Electricity Regulatory Commissions Act, 1998 (p3). It is deemed to have come into force from 1 April 2003, i.e. retrospectively, not from the date of publication (p4).
After the short-title and commencement clauses, the notification deletes Regulation 1.12 of the Principal Regulations (p4) and inserts a new definition of "Small Gas Turbine Power Station" into Regulation 2.1 — gas- and naphtha-based stations with gas turbines of 50 MW or below (p4). That capacity threshold is what splits stations into two normative classes for the rest of the amendment.
The substantive content is clause 5, which substitutes the gross station heat rate norms for gas and naphtha based stations in Regulation 2.4(iv). It sets separate norms for open-cycle and combined-cycle operation; gives station-specific figures for two named plants (Assam Gas Based, Kathalguri and Agartala Gas Based, Ramchandanagar); and for all other small gas turbine stations distinguishes natural gas from liquid fuel, the latter expressed as multipliers of the natural gas values rather than absolute numbers (p4).
Clauses 6 to 8 are narrower: a requirement that gas turbine/combined cycle stations declare capacity on the basis of what can be made available at 50 Hz (Regulation 2.17(ii)); and replacement of the term "IPTC/JV Routes" with "Joint Venture route" wherever it appears in Regulation 4.4(d) and Regulation 4.10A (p5). A closing note records the Gazette publication history of the Principal Regulations and its two earlier amendments (p5).
Read with this
The regulation
- Dated 26 Mar 2001Terms & Conditions of Tariff Regulations, 2001
Amendments and corrections
- Dated 23 May 2003Terms and Conditions of Tariff (Second Amendment) Regulations, 2003
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.