Skip to content

KERC · Karnataka Electricity Regulatory Commission

Generation Tariff Regulations, 2024 — Draft

Karnataka Electricity Regulatory Commission (Terms and Conditions for Determination of Generation Tariff) Regulations, 2024

Draft regulationDated 19 Apr 2024KERC/S/2024/61 dated 19.04.2024

Draft

A proposal that has since been finalised as the Generation Tariff Regulations, 2024.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on kerc.karnataka.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the KERC's draft notification No. KERC/S/2024/61 dated 19.04.2024, publishing the draft Karnataka Electricity Regulatory Commission (Terms and Conditions for Determination of Generation Tariff) Regulations, 2024 for stakeholder objections (p1–2). It is issued under s.181 read with ss.61 and 62 of the Electricity Act, 2003, and states the draft will be finalized after 30 days from publication in the Karnataka Official Gazette (p2). It extends to Karnataka and is to remain in force from 1 April 2024 to 31 March 2029, unless reviewed earlier or extended (p2).

Scope: the regulations apply where tariff for a generating station or unit achieving COD from 1 April 2024 to 31 March 2029 is to be determined under s.62 read with s.86. They exclude renewable-energy stations covered by the 2004 RE procurement regulations and projects whose tariff is discovered through s.63 competitive bidding. For pre-1 April 2024 projects with tariff not finally determined, earlier periods are routed to the 2009, 2014 and 2019 generation tariff regulations (p2–3).

Chapters 1–4 deal with definitions, COD, procedure and tariff structure. Chapter 1 defines the financial, technical and mining terms used across the instrument, including integrated mine, input price, cut-off date, change in law, force majeure and emission control system (p3–19). Chapter 2 specifies COD for stations/units and integrated mines, sale of infirm power and pre-COD coal/lignite supply (p19–21). Chapter 3 sets the tariff application, scrutiny, publication, in-principle approval and true-up procedure, including a 2019-24 true-up and a 2024-29 true-up (p21–32). Chapter 4 provides the tariff structure: two-part capacity and energy charges for thermal stations, supplementary charges for emission control systems, hydro capacity/energy charges, and a special arrangement for thermal stations that have completed 25 years (p32–34).

Chapters 5–8 contain the financial methodology. They cover debt-equity, capital cost and prudence check, IDC/IEDC, initial spares, additional capitalization (within and beyond original scope), R&M, special allowance and revised emission standards (p34–53); and annual fixed cost components — return on equity, tax grossing, interest on loan, depreciation, working capital and O&M norms for thermal and hydro stations (p54–71).

Chapter 9 creates a separate input-price framework for coal/lignite from integrated mines: ROM cost, additional charges, capital cost, additional capex, annual extraction cost, O&M, working capital, mine closure, OB/GCV/non-tariff-income adjustments, credit adjustment notes and quality measurement (p71–92). Chapter 10 specifies energy charge components, landed fuel cost, transit and handling losses, GCV measurement and reagent costs (p92–95). Chapter 11 gives monthly capacity charge, supplementary capacity charge, energy charge and hydro/pumped-storage formulae, plus deviation charges (p95–114). Chapter 12 sets the normative operating parameters and incentives (p114–125). Chapters 13–15 cover scheduling, metering, billing, rebate and late payment surcharge, sharing of gains and savings, and miscellaneous powers (p125–136). Appendices I–III give depreciation schedules for existing projects, new projects and integrated mines (p137–142).

Standard name
Generation Tariff Regulations
Primary topics
Generation tariff, Tariff determination, Capital cost and investment

Read with this

The regulation

Other copies of these documents (1)

One more document belongs here and is not on Voltaic: a copy in another language.

Voltaic last read KERC's website for final documents on 24 Nov 2026 (3 pages) and for drafts on 23 Nov 2026. A document KERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on kerc.karnataka.gov.in ↗