Skip to content

KERC · Karnataka Electricity Regulatory Commission

Generation Tariff Regulations, 2024

Karnataka Electricity Regulatory Commission (Terms and Conditions for Determination of Generation Tariff) Regulations, 2024.

Regulation · Gazette copyDated 9 Sep 2024Published in the Gazette 17 Sep 2024In force from 1 Apr 2024KERC/S/2024/653 dated 09.09.2024

The Gazette copy of the Generation Tariff Regulations, 2024.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on kerc.karnataka.gov.in ↗

Summary

Summary written by software, from pages 1 to 33 of 121. Check the regulator's original before you rely on it.

The Commission's order at pp1-3 approves the KERC (Terms and Conditions for Determination of Generation Tariff) Regulations, 2024, made under s.181(2)(zd) read with s.61 of the Electricity Act, 2003. The regulations apply for the control period 2024-29, extend to the whole of Karnataka, and come into force from 1 April 2024, remaining in force until 31 March 2029 unless reviewed earlier or extended (p4). The order records the draft regulations notified on 19 April 2024, a public hearing on 25 June 2024, and states that matters not covered are governed by the CERC (Terms and Conditions of Tariff) Regulations, 2024 (pp2-3).

Appendix-I, beginning p3, contains the operative regulations. Chapter 1 (pp4-17) sets the title, commencement and scope; it applies where tariff for a generating station or unit achieving commercial operation between 1 April 2024 and 31 March 2029 is to be determined under s.62 read with s.86. It excludes renewable-energy stations covered by the 2004 RE procurement regulations and stations whose tariff was discovered through competitive bidding under s.63. Transitional provisions route projects not finally determined to the 2009, 2014 or 2019 generation tariff regulations for the periods ending 31 March 2014, 2019 and 2024 respectively. The chapter also contains extensive definitions and interpretation provisions covering capital cost, change in law, COD, declared capacity, integrated mines, input price, emission control systems, auxiliary consumption, useful life and related concepts.

Chapter 2 (pp17-19) governs date of commercial operation, including special rules for integrated mines, sale of infirm power and supply of coal or lignite before an integrated mine's COD. Chapter 3 (pp19-27) lays down the procedure for tariff determination: petitions, timelines (including 30 November 2024 for existing projects and 30 November 2029 for truing-up applications), deficiency and additional-information processes, publication of applications and public objections, interim tariff, in-principle approval for large change-in-law or force majeure expenditure, and truing up for 2019-24 and 2024-29, with an interim truing-up window in 2026-27. Chapter 4 (pp27-29) sets out the tariff structure: two-part capacity and energy charges for thermal stations, separate supplementary tariff for emission control systems, annual fixed cost components, energy charge components, and a special arrangement for thermal stations that have completed 25 years. Chapter 5 (pp29-31) specifies the debt-equity ratio and treatment of equity, grants, foreign-currency investment and additional capitalization. Chapter 6 (pp31-33) deals with computation of capital cost for new, existing and hydro projects, including R&R, local infrastructure, ash, railway, biomass, PAT and flexible-operation expenditure. Later chapters are referred to but not available.

Standard name
Generation Tariff Regulations
Primary topics
Generation tariff, Tariff determination, Multi Year Tariff (MYT)

Read with this

The regulation

Earlier drafts

One more document belongs here and is not on Voltaic: a copy in another language.

Voltaic last read KERC's website for final documents on 24 Nov 2026 (3 pages) and for drafts on 23 Nov 2026. A document KERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on kerc.karnataka.gov.in ↗

Report an issue with this document