Amendment to the Tariff Policy, 2011

Amendment to the Tariff Policy (notified on 08.07.2011)

AmendmentDated 8 Jul 2011Published in the Gazette 8 Jul 2011F.No.23/2/2005-R&R(Vol.V) dated 8th July, 2011

Replaced by Revised Tariff Policy, 2016

See that regulation for the date it took effect and for anything it keeps in force.

Amends the Tariff Policy, 2006.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on wberc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a Ministry of Power resolution amending the Tariff Policy notified under Section 3 of the Electricity Act, 2003. Published in the Gazette of India (Extraordinary) on 8 July 2011 (p1–2), it is expressed to take effect from 6 January 2011 (p3), so its provisions apply retroactively between those two dates.

The resolution recites the original policy of 6 January 2006 and the two earlier amendments of 31 March 2008 and 22 January 2011 (p2). It then substitutes three sets of provisions in the Tariff Policy. First, it replaces the proviso paragraph of para 5.1, dealing with the option available to developers of hydroelectric projects to have tariffs determined by the appropriate Commission under performance-based cost-of-service regulations, subject to stated conditions (p3). Second, it replaces sub-para (c) of para 5.1, which sets the milestones and timeline (concurrence, financial closure, award of work and long-term PPA of more than 35 years) that a project must meet to qualify under that clause (p3). Third, it replaces sub-paras (6) and (7) of para 7.1 on transmission (p3): para 7.1(6) opens transmission development by CTU/STUs to competitive bidding, references the 2006 central bidding guidelines, and lists three cases exempted from the competitive route (two experimental 1200 KV HVDC works; urgent or compressed-schedule works decided by the Central Government case by case; and intra-state transmission projects by STUs for a further two years beyond 6 January 2011). Para 7.1(7) directs SERCs to adopt an approach similar to the CERC inter-state transmission framework for intra-state transmission within two years, considering voltage, distance, direction and quantum of flow. The amendment is signed by the Additional Secretary (p3).

Standard name
Tariff Policy
Primary topics
Competitive bidding, Generation tariff, Transmission tariff

Read with this

The regulation

Amendments and corrections

Voltaic last read WBERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document WBERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on wberc.gov.in ↗

Report an issue with this document