Tariff Policy, 2006 — Hydro Amendment, 2008

Amendment to the Tariff Policy (notified on 20.01.2011)

AmendmentDated 31 Mar 2008Published in the Gazette 31 Mar 2008F.No.23/2/2005-R&R(Vol.IV) dated 31st March, 2008

Replaced by Revised Tariff Policy, 2016

See that regulation for the date it took effect and for anything it keeps in force.

Amends the Tariff Policy, 2006.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on wberc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a Ministry of Power resolution of 31 March 2008, gazetted the same day (p1), that amends the Tariff Policy notified on 6 January 2006 under Section 3 of the Electricity Act, 2003. The operative part does one thing: it adds a proviso to Para 5.1 of the Tariff Policy giving developers of hydroelectric projects that are not State-controlled or State-owned companies the option of having their tariff determined by the appropriate Commission on performance-based cost-of-service regulations (p1).

The option is conditional. The developer must show the site was allotted by the State Government through a transparent two-stage process — prequalification on financial strength, past experience and track record, then bidding on a single quantifiable parameter such as free power in excess of 13%, equity participation or upfront payment. Projects above a stated design capacity whose sites were awarded earlier on predetermined criteria are also covered (p1). CEA concurrence, financial closure, award of work and long-term PPAs must be completed by 31.12.2010 (p2); long-term PPAs must cover at least a stated share of saleable design energy, escalating with delay in commissioning, and equipment and construction contracts must go through international competitive bidding (p2).

Where the conditions are met, the Commission is directed how to build the tariff: expenditure on obtaining the site is excluded from project cost, while the approved R&R plan cost and the developer's RGGVY contribution in the affected area are included (p2–3). Annual fixed charges are pro-rated to energy tied up under long-term PPAs, and saleable design energy is defined net of free power to the host State and the Local Area Development Fund and of free monthly units to project affected families (p3).

The Appendix (pp4–5) sets out the salient features of the approved R&R provisions for hydro projects — who counts as a project affected family, agricultural and non-agricultural labourers and squatters, resettlement colonies, training and capacity building, and additional welfare provisions — and the tariff conditions incorporate it by reference.

Standard name
Tariff Policy
Primary topics
Tariff determination, Generation tariff, Capital cost and investment

Read with this

The regulation

Amendments and corrections

Voltaic last read WBERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document WBERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on wberc.gov.in ↗

Report an issue with this document