CorrigendumDated 17 Jun 2025Published in the Gazette 30 Jun 2025No. AERC-959/2024/37 dated The 17th June, 2025
Corrects the Deviation Settlement Mechanism and Related Matters Regulations, 2024.
Summary
Summary written by software. Check the regulator's original before you rely on it.
A one-page corrigendum issued by the Assam Electricity Regulatory Commission, published in the Assam Gazette (Extraordinary) of 30 June 2025 and dated 17 June 2025 (p1). It amends the AERC (Deviation Settlement Mechanism and Related Matters) Regulations, 2024 ('Principal Regulations') by inserting a new sentence into Regulation 7.3(b) and restating that sub-regulation in full.
Regulation 7.3(b) governs how the deviation-buyer quantum is computed for buyers who are Embedded Open Access Consumers — both the absolute deviation-buyer figure in MWh and the percentage deviation-buyer figure, in each case as the difference between actual drawal and contracted load over contracted load (p1). The inserted sentence states the substantive change: "There shall be no payable/receivable up to contract demand." The corrected text of 7.3(b) is reproduced in full with that sentence appended (p1).
It is signed by the Secretary, AERC. Nothing in the document states a commencement date, a savings clause or any other consequential change to the Principal Regulations.
Read with this
The regulation
Commencement notices and reasons
- Dated 9 Dec 2024Assam DSM Regulations, 2024 — Statement of Objects and Reasons
Voltaic last read AERC's website for final documents on 30 Sep 2026. A document AERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.