Assam DSM Regulations, 2024 — Statement of Objects and Reasons

Statement of Objects and Reasons — Assam Electricity Regulatory Commission (Deviation Settlement Mechanism and Related Matters) Regulations, 2024

Statement of reasonsDated 9 Dec 2024

The commission's reasons for the Deviation Settlement Mechanism and Related Matters Regulations, 2024.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on aerc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is AERC's Statement of Objects and Reasons for its new Deviation Settlement Mechanism (DSM) Regulations, 2024, dated 9 December 2024 (p2). It is not the regulation itself: it explains why the regulation was made, records the consultation, and gives the Commission's ruling on every comment received. It matters because it is the authoritative record of what changed between the draft and the final text, and of the reasoning the Commission will rely on later.

Part 1 sets the context: AERC had earlier notified the 2018 Forecasting, Scheduling and DSM Regulations for solar and wind, and the 2019 DSM Regulations; CERC notified its own DSM Regulations on 5 August 2024; other statutory directions required AERC to act, so the 2024 regulations were framed under the Electricity Act 2003 (p2). Part 2 records publication of the draft on the Commission's website and a public notice of 22.10.2024 in two newspapers, with objections due by 12 November 2024 (p2–3). Part 3 lists the six entities that commented — APDCL, SLDC, Star Cement, Ampin Energy, Manikaran Power and Dalmia Cement — and the 21 participants at the public hearing of 22.11.2024 (p3).

Part 4 is the substance, running clause by clause through the draft: definitions of buyer, contract rate, deviation, scheduled drawal, embedded consumer, full open access customer, QCA, RE-rich State and control area (p4–8); applicability and who is exempt (p8–9); adherence to schedule (p9–10); computation of buyer deviation (p10–11); the normal rate of deviation charges (p11–12); volume limits and charges for buyers (p13–15); payment timelines (p15–16); and repeal of the 2018 and 2019 regulations (p16–17). Part 4.10 deals with residual issues raised by APDCL, SLDC, Star Cement and Ampin — scheduling flexibility, RE forecasting limits, embedded consumers and DSM-module costs (p17–22). The closing paragraphs order that the draft be finalised and notified in the Official Gazette with the modifications discussed (p23).

Standard name
DSM Regulations
Primary topics
Deviation settlement (DSM), Scheduling and despatch, Energy accounting and settlement

Read with this

Voltaic last read AERC's website for final documents on 30 Sep 2026. A document AERC issued after the page that lists it was read may not be held by Voltaic yet.