Skip to content

AERC · Assam Electricity Regulatory Commission

Deviation Settlement Mechanism and Related Matters Regulations, 2024

AERC (Deviation Settlement Mechanism and Related Matters) Regulations, 2024

RegulationDated 9 Dec 2024Published in the Gazette 18 Dec 2024

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on aerc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Assam Electricity Regulatory Commission issued this principal regulation under the Electricity Act, 2003 to replace its earlier deviation settlement framework. The notification (p1) gives commencement from 1 April 2025, extends to Assam, and repeals the 2019 DSM Regulations and the 2018 solar/wind forecasting, scheduling and DSM Regulations, with savings for past actions (p20). Regulations 2–6 (pp2–9) define the actors and concepts — sellers and buyers, WS, MSW and RoR sellers, QCA aggregation, ESS, RE-rich and RE Super-rich state categories, time-blocks, contract rate, reference charge rate and the State Deviation and Ancillary Services Pool Account — and impose scheduling, connection-agreement, metering and SLDC-instruction duties. Regulation 7 (pp9–10) specifies how deviation is computed for general sellers, WS sellers (with separate phases up to 31 March 2026 and from 1 April 2026) and buyers, including embedded open access consumers. Regulation 8 (p10) defines the normal rate by reference to power-exchange prices and ancillary service charges, with a fallback when ACP is unavailable. Regulation 9 (pp11–16) is the core charging scheme: frequency-linked charges for ordinary general sellers, frequency-independent charges for RoR, MSW and WS sellers, special treatment for standalone ESS and WS-plus-ESS, and buyer charges with volume limits that vary by schedule size and whether the state is RE-rich or Super RE-rich; it also covers infirm power, start-up/auxiliary drawal, forced outages, HP-DAM and net-injection states. Regulations 10–12 (pp17–19) require obedience to SLDC instructions, create weekly SLDC pool-account accounting and surplus/deficit rules, and set payment, interest and letter-of-credit discipline. Regulations 13–19 (pp20–21) deal with monitoring, amendment, relaxation, directions, repeal and savings, and interpretation, with any gap to follow the CERC DSM Regulations, 2024.

Standard name
DSM Regulations

Read with this

Commencement notices and reasons

Voltaic last read AERC's website for final documents on 30 Sep 2026. A document AERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of AERC's website on 30 Sep 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on aerc.gov.in ↗

Report an issue with this document