Skip to content

KERC · Karnataka Electricity Regulatory Commission

Intra-State Deviation Settlement Mechanism and Related Matters Regulations, 2025

Karnataka Electricity Regulatory Commission (Intra-State Deviation Settlement Mechanism and Related Matters) Regulations, 2025.

RegulationDated 15 Jul 2025KERC/S/F-61/Vol-29(1)/503 dated 15.07.2025

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on kerc.karnataka.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

KERC's notification No. KERC/S/F-61/Vol-29(1)/503 dated 15.07.2025 makes the Karnataka Electricity Regulatory Commission (Intra-State Deviation Settlement Mechanism and Related Matters) Regulations, 2025 (p1, p3). Pages 1-2 are the notification and preamble: the Commission records that the draft 2024 Regulations were gazetted and publicised on 28.08.2024 in four newspapers, that a public hearing was held on 19.12.2024, and that stakeholder comments were considered before the final regulations were approved and signed (p1-2). The operative text runs from p3 to p27; the regulations take effect from the date of publication in the Karnataka gazette, which is not printed (p3).

Chapter 1 fixes the title, application across Karnataka to all entities connected with the STU, and commencement (p3). Chapter 2 states the objective — a commercial mechanism to keep grid users to their schedules (p3). Chapter 3 defines some fifty terms, including Buyer, Seller, General Seller, Hydro Seller, run-of-river station, Deviation, Contract Rate, Reference Charge Rate, Normal Rate, Time Block and the MSC/SSC consumer categories (p4-10).

Chapter 4 recasts the ABT tariff into capacity, energy and deviation components (p10-11). Chapter 5 sets out who is covered — KPCL stations, conventional fuel-based plants including CGPs, non-wind/solar renewable plants above 5 MW, distribution licensees and open access consumers — and carves out a deviation-charge-only regime for supply to single/multiple supply consumers and for exports (p11-13). Chapter 6 is the operational core: how deviation is computed for general sellers, RE sellers and buyers (p13); how the Normal Rate is derived from day-ahead, real-time and ancillary service prices (p14); and the frequency-linked charge tables for general sellers, frequency-independent charges for run-of-river and municipal-solid-waste stations, and buyer charge tables with licensee-wise volume-limit bands (p14-17). It also covers infirm power, start-up and auxiliary power, forced outage, zero contract demand and multiple contracts (p17-18).

Chapter 7 governs declared capacity and scheduling timelines, schedule revisions, SLDC's own-motion revision and curtailment, grid disturbance, and consequences of scheduling beyond approved open access (p18-21). Chapter 8 prescribes settlement at the drawal point for single-supply and multiple-supply consumers (p21-22). Chapter 9 sets the State DSM Account, the State Deviation Pool Account, payment timelines, interest on delayed payment and letter-of-credit security (p22-26). Chapter 10 gives the Commission power to relax provisions, repeals the 2006 intra-state ABT order, and preserves removal-of-difficulty and practice-direction powers (p26-27).

Standard name
DSM Regulations
Primary topics
Deviation settlement (DSM), Scheduling and despatch, Energy accounting and settlement

Read with this

Other copies of these documents (1)

One more document belongs here and is not on Voltaic: a copy in another language.

Voltaic last read KERC's website for final documents on 24 Nov 2026 (3 pages) and for drafts on 23 Nov 2026. A document KERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of KERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on kerc.karnataka.gov.in ↗

Report an issue with this document