KERC · Karnataka Electricity Regulatory Commission
Intra-State Deviation Settlement Mechanism and Related Matters Regulations, 2024 — Draft
Karnataka Electricity Regulatory Commission (Intra-State Deviation Settlement Mechanism and Related Matters) Regulations, 2024
Draft regulationDated 24 Sep 2024KERC/S/2024/ 693 dated 24.09.2024
Draft
A proposal that has since been finalised as the Intra-State Deviation Settlement Mechanism and Related Matters Regulations, 2025.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Commission's draft of the Karnataka Electricity Regulatory Commission (Intra-State Deviation Settlement Mechanism and Related Matters) Regulations, 2024, notified on 24.09.2024 for previous publication. It is a consultation instrument: the Commission states the draft will be finalised after 30 days from its publication in the Karnataka Gazette and invites objections and suggestions to the Secretary within the same 30-day window (p1–2). Sections 1 to 3 fix the title, confine application to entities connected with the STU inside Karnataka, and set commencement from Gazette publication (p3). Chapter 3 is a long definitional chapter covering settlement entities, market-price concepts, open-access consumer classes (SSC, MSC) and the state grid architecture (p3–9).
Chapter 4 describes the three-part Availability Based Tariff structure — capacity, energy and deviation charges (p10). Chapter 5 sets out who is caught by intra-state ABT: state, conventional, renewable and captive generators by contract type, distribution licensees, and open access consumers and captive users (p10–12). Chapter 6 is the operative core: it gives the formulae for computing deviation of general sellers, RE sellers and buyers, derives the Normal Rate of deviation charge from power-exchange market prices and ancillary service charges, and lays out frequency-linked charge slabs with separate treatments for run-of-river stations, municipal solid waste stations, buyers and volume-limit bands (p12–18). It also covers unscheduled generation, inter-state versus intra-state open access rate factors, infirm power, start-up power, forced-outage relief and multiple contracts (p14–18).
Chapter 7 prescribes scheduling and despatch — loss-bearing, declaration of capacity, schedule revisions, SLDC-initiated revisions, curtailment priority and the treatment of excess scheduling (p19–22). Chapter 8 covers energy accounting at the drawal point for single-supply and multiple-supply consumers (p22–23). Chapter 9 creates the State Deviation Settlement Mechanism Account, its weekly and monthly billing cycles, the State Deviation Pool Account, payment timelines, interest on delay, Letter of Credit security and recovery against defaulters (p23–27). Chapter 10 gives the Commission power to relax provisions, repeals the Commission's 20.06.2006 intra-state ABT order on commencement, and allows removal of difficulties and suo-motu orders and practice directions (p27).
Read with this
The regulation
Other copies of these documents (1)
One more document belongs here and is not on Voltaic: a copy in another language.
Voltaic last read KERC's website for final documents on 24 Nov 2026 (3 pages) and for drafts on 23 Nov 2026. A document KERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.