Intra-State Deviation Settlement Mechanism and Related Matters Regulations, 2025

Karnataka Electricity Regulatory Commission (Intra-State Deviation Settlement Mechanism and Related Matters) Regulations, 2025.

Regulation · Gazette copyDated 15 Jul 2025Published in the Gazette 22 Jul 2025KERC/S/F-61/Vol-29(1)/503 dated 15.07.2025

The Gazette copy of the Intra-State Deviation Settlement Mechanism and Related Matters Regulations, 2025.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on kerc.karnataka.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Karnataka Electricity Regulatory Commission's principal regulation replacing the State's old intra-state ABT/deviation regime. The notification was signed on 15 July 2025 and published in the Karnataka Gazette on 22 July 2025 (p1); the Regulations take effect from that gazette publication and apply across Karnataka to all inter-/intra-state entities connected to the State Transmission Utility (p3). The preamble and Order on pp1-2 record why it is being made, the 2024 draft that was gazetted and advertised on 28.08.2024, and the public hearing held on 19.12.2024.

Chapter 1 states the short title, application and commencement; Chapter 2 sets the objective of holding grid users to schedule through a commercial mechanism; Chapter 3 defines the vocabulary used throughout — deviation, sellers and buyers, contract/reference rates, deviation charge rates, open-access consumer classes, pool account and settlement terms (p3-10).

Chapter 4 sets out that ABT tariff has three components — capacity, energy and deviation charge — and Chapter 5 lists who is covered: KPCL stations, conventional and captive plants, renewable plants (with an explicit installed-capacity threshold of more than 5 MW for the long/medium-term category, p12), distribution licensees, open-access consumers/captive users, plus entities covered only for the deviation-charge component (p10-13).

Chapter 6 is the operative core (p13-18): how deviation is computed for general sellers, RE sellers and buyers, how the Normal Rate is derived from power-exchange prices and ancillary service charges, and frequency-linked charge schedules for general sellers, run-of-river hydro and municipal-solid-waste stations, and for buyers — including volume-limit bands for buyers and licensee-wise limits that the Commission says it will revise annually on SLDC's approach (p17). It also deals with infirm power, start-up power, forced outage, reduced-contract-demand consumers and multiple contracts.

Chapter 7 governs scheduling and despatch (p18-22): loss bearing, declaration of capacity and revision timelines, SLDC's power to revise schedules, discipline for over/under-declaration, grid disturbance and curtailment rules, and penalties for scheduling above approved open access. Chapter 8 sets energy accounting and settlement for single-supply and multiple-supply consumers (p22-23). Chapter 9 creates the State Deviation Settlement Mechanism Account, its monthly billing cycle, verification and publication of bills, the State Deviation Pool Account operated by the distribution licensee, payment timelines, late-payment interest and a Letter of Credit obligation for defaulters (p23-27). Chapter 10 gives the Commission power to relax provisions, make savings, remove difficulties and issue practice directions, and repeals the 20.06.2006 intra-state ABT order (p27).

Standard name
DSM Regulations
Primary topics
Deviation settlement (DSM), Scheduling and despatch, Energy accounting and settlement

Read with this

One more document belongs here and is not on Voltaic: a copy in another language.

Voltaic last read KERC's website for final documents on 24 Nov 2026 (3 pages) and for drafts on 23 Nov 2026. A document KERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on kerc.karnataka.gov.in ↗