Skip to content

HPERC · Himachal Pradesh Electricity Regulatory Commission

Power System Development Fund Regulations, 2020 — Draft

Himachal Pradesh Electricity Regulatory Commission (Power System Development Fund) Regulations, 2020

Draft regulationDated 17 Jun 2020HPERC-H(1)32/2020 dated 17.06.2020

Draft

A proposal that has since been finalised as the Power System Development Fund Regulations, 2020.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on hperc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a consultation draft. HPERC notification HPERC-H(1)32/2020 of 17 June 2020 publishes the draft Himachal Pradesh Electricity Regulatory Commission (Power System Development Fund) Regulations, 2020 for objections and suggestions, which must be received within thirty days of publication in the Rajpatra (pp1–2). The draft would create the framework for spending the State Power System Development Fund — the fund that regulation 15 of the HPERC (Deviation Settlement Mechanism and Related Matters) Regulations, 2018 requires HPSLDC to open, operate and maintain out of surpluses in the State Deviation Pool Account (p1, p3).

Draft regulation 3 sets what may be funded: works not already funded by the State Government, Central Government or the Project Entity, covering distribution system improvement (including beyond the points where renewable generators connect), relief of congestion in the intra-state transmission and distribution system, special and standard protection schemes and corrections identified in protection audits, and allied items such as technical studies, capacity building, voltage-profile improvement, SLDC hardware and software, smart grid, energy storage, demand side management, power system communication and PMU-based monitoring. Private-sector schemes are excluded (pp3–4).

Draft regulations 4–8 build the process. Project Entities — the STU, a distribution licensee or HPSLDC — submit cost-benefit-supported schemes to the Nodal Agency, HPSLDC, by 30 September 2020 and quarterly thereafter (pp4–5). HPSLDC as Nodal Agency prepares the detailed guidelines, scrutinises each quarter's proposals in a single lot, routes them to an Appraisal Committee for techno-economic appraisal, and forwards recommended schemes to the Commission for sanction (pp5–8). The Commission shortlists and sanctions schemes against the funds available, releases money on the Monitoring Committee's recommendations with a limited upfront release on request, and may revise scope, cost or completion targets (pp8–9). The Monitoring Committee reviews implementation and operation-stage benefits and recommends releases, remedial measures and funding of cost overruns (pp9–10).

Draft regulations 9–11 cover money and assets: PSDF releases are normally treated as grant in ARR unless the Commission orders otherwise; the Project Entity executes and maintains the assets for their useful life and reports monthly and quarterly; SLDC keeps PSDF budget, accounts, utilisation certificates, audit and annual reports separately (p11). Draft regulations 12–16 are residual clauses — removal of difficulties, relaxation in the public interest, final interpretation by the Commission, inherent power to depart from the prescribed procedure, and amendment (pp11–12).

Primary topics
Power System Development Fund (PSDF)

Read with this

The regulation

Commencement notices and reasons

Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on hperc.org ↗

Report an issue with this document