Skip to content

HPERC · Himachal Pradesh Electricity Regulatory Commission

Power System Development Fund Regulations, 2020 — Finalisation Order

Order w.r.t Finalisation of HPERC (Power System Development Fund) Regulations, 2020

OrderDated 22 Aug 2020Published in the Gazette 26 Oct 2018HPERC-H(1)32/2020.- dated 22/08/2020

Read with the Power System Development Fund Regulations, 2020.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on hperc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Commission's finalisation order for the HPERC (Power System Development Fund) Regulations, 2020, issued at Shimla on 22 August 2020 as HPERC-H(1)32/2020 (p1, p9). It does not reproduce the regulations; it records the consultation on the draft published in June 2020 and the changes the Commission decided to make before finalising them.

Paras 1–3 set the context: the DSM Regulations, 2018 (notified 16 October 2018, gazetted 26 October 2018, in force 3 December 2018) require under Reg 15 that surplus in the State Deviation Pool Account be transferred to a State Power System Development Fund opened, operated and maintained by HPSLDC, and the Commission decided to make separate regulations for its use (p1).

Para 4 records publication of the draft in the Rajpatra on 20 June 2020 and in two newspapers, notice to stakeholders, and a 24 July 2020 comment deadline (p1–2); para 5 lists the three commenters (p2). Para 6, the bulk of the document, is a regulation-by-regulation statement of reasons (paras 6.1–6.8, p2–9): it declines to widen the definition of "Project Entity" to include the State generating utility, keeping funding to works of common benefit; retains the generic scope of fundable works, accepting only the addition of HPALDC alongside HPSLDC in one item; leaves scheme submission formats to guidelines framed by the Nodal Agency; rewrites two Nodal Agency functions; settles the composition of the Appraisal and Monitoring Committees; raises the upfront grant release limit; and declines to freeze scheme scope and cost after sanction. Para 6.8 records that no comments were received on the remaining provisions, which are retained unchanged. The order closes with the decision to finalise the regulations with these changes and other minor changes, dated Shimla 22 August 2020 (p9).

Primary topics
Power System Development Fund (PSDF)

Read with this

The regulation

Earlier drafts

Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on hperc.org ↗

Report an issue with this document