The Himachal Pradesh Electricity Regulatory Commission (Power System Development Fund) Regulations, 2020, notified at Shimla on 22 August 2020 (p1), create the governance for a State Power System Development Fund — a corpus opened, operated and maintained by the State Load Despatch Centre and used to fund transmission, distribution and system-operation works in the State that no other scheme pays for.
Regulations 1–2 (pp1–2) give the title and commencement (in force on publication in the Rajpatra, Himachal Pradesh, whose date is not printed) and define the actors: the Commission, the HPSLDC as Nodal Agency, an Appraisal Committee, a Monitoring Committee, Project Entities (STU, distribution licensee, HPSLDC) and a 'Scheme'.
Regulation 3 (pp2–3) sets what qualifies for funding — proposals not covered fully or partially by State, Central or Project Entity schemes, covering LT/HT/EHT distribution improvement, congestion-relieving transmission/distribution works of strategic importance, protection schemes and audits, and enabling works such as technical studies, capacity building, voltage-profile improvement, HPSLDC/HPALDC hardware and software, smart grid, energy storage, demand-side management, power-system communication and PMU-based monitoring. Proposals must benefit a larger part of the State power system, and private-sector schemes are excluded.
Regulation 4 (p4) requires Project Entities to file cost-benefit-supported draft schemes with the Nodal Agency, first by 30 September 2020 and quarterly thereafter. Regulation 5 (pp4–6) makes HPSLDC the Nodal Agency and lists its functions: drafting process guidelines, quarterly scrutiny of proposals in a single lot, routing them to the Appraisal Committee and then to the Commission, and monthly, quarterly and half-yearly monitoring and reporting, plus annual PSDF reporting and secretariat support.
Regulation 6 (p7) composes the Appraisal Committee and gives it techno-economic appraisal; Regulation 7 (pp8–9) gives the Commission the sanction decision on stated shortlisting criteria, ties fund release to Monitoring Committee recommendations (with a limited upfront-release proviso), and allows later revision of scope, cost and targets. Regulation 8 (pp9–10) constitutes the Monitoring Committee and defines its review, release-recommendation and cost/time-overrun functions. Regulation 9 (p10) treats PSDF money as a grant for ARR purposes unless the Commission orders otherwise; Regulation 10 (p11) puts execution and O&M on the Project Entity; Regulation 11 (p11) assigns budget, accounts, utilisation certificates, audit and annual reports to the SLDC. Regulations 12–16 (pp11–12) are the Commission's standard residual powers to remove difficulties, relax, interpret, depart from procedure and amend.
Read with this
Commencement notices and reasons
- Dated 22 Aug 2020Power System Development Fund Regulations, 2020 — Finalisation Order
Procedures and orders made under it
Earlier drafts
- Dated 17 Jun 2020Power System Development Fund Regulations, 2020 — Draft
Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of HPERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.