UERC · Uttarakhand Electricity Regulatory Commission
Multi Year Tariff (Second Amendment) Regulations, 2023 — Statement of Reasons
UERC (Terms and Conditions for Determination of Multi Year Tariff) (Second Amendment) Regulations, 2023
Statement of reasonsDated 16 Aug 2023
Replaced by Terms and Conditions for Determination of Multi Year Tariff Regulations, 2024
See that regulation for the date it took effect and for anything it keeps in force.
The commission's reasons for a regulation Voltaic does not hold or one of its amendments.
Summary
Summary written by software. Check the regulator's original before you rely on it.
The document is the Statement of Reasons for the Uttarakhand Electricity Regulatory Commission's second amendment to its Multi Year Tariff Regulations, 2021. It explains why Regulation 83 on Fuel Charge Adjustment (FCA) is being replaced by a Fuel and Power Purchase Cost Adjustment (FPPCA) mechanism, in order to align with Rule 14 of the Electricity (Amendment) Rules, 2022 (MoP notification dated 29.12.2022) (p1, p7). It records the consultation process: a draft amendment was issued, comments closed on 25.07.2023, and a public hearing was held on 11.08.2023; an earlier UPCL petition had been rejected by order dated 09.05.2023 (p1–2). Pages 4–18 summarise stakeholder objections — automatic monthly pass-through, high FCA, lack of reliable supply, voltage-wise losses, cross-subsidy, cess/royalty — and the Commission's responses, including what it accepted or rejected. The final revised Regulation 83 is reproduced at pages 19–21. It specifies FPPCA applicability on the entire sale of the distribution licensee, computation on actual variation in fuel and power purchase costs, monthly n+2 charging without prior approval but with quarterly post-facto approval, carry-forward of under/over recovery, a ceiling per consumer category, a formula for FPPCA and its components, category-wise allocation based on average billing rates, penalties for unjustified charging over consecutive months, forfeiture for missing timelines, and transparency/notice requirements. Annexure-I lists stakeholders who commented (p22). The SoR says that if it conflicts with the second amendment, the amendment text prevails (p2).
Read with this
Voltaic does not hold the regulation itself.
Amendments and corrections
Commencement notices and reasons
2 more documents belong here and are not on Voltaic: 2 copies in another language.
Voltaic last read UERC's website for final documents on 24 Nov 2026. A document UERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.