UERC · Uttarakhand Electricity Regulatory Commission
Terms and Conditions for Determination of Multi Year Tariff Regulations, 2024
Uttarakhand Electricity Regulatory Commission (Terms and Conditions for Determination of Multi Year Tariff) Regulations, 2024
RegulationDated 17 Sep 2024No. F-9(36)/RG/UERC/2024/855 dated September 17, 2024
Summary
Summary written by software, from pages 1 to 32 of 368. Check the regulator's original before you rely on it.
This is Uttarakhand's principal multi-year tariff regulation, issued by notification dated 17 September 2024 (No. F-9(36)/RG/UERC/2024/855) under Section 61 read with Section 181 of the Electricity Act, 2003. It extends to the whole of Uttarakhand and governs tariff determination for the three-year control period from 1 April 2025 to 31 March 2028 (p1). The version supplied covers pages 1–32 of 368.
Part I (pp1–9) gives the short title, extent and commencement, the scope, and a long definitional list. The Regulations cover generation-to-distribution supply, intra-state transmission, SLDC charges and retail supply, and — where the Commission has permitted open access under Section 42 — wheeling charges, cross-subsidy surcharge and additional surcharge. Two carve-outs are stated: tariffs discovered through competitive bidding under Section 63, and renewable generating stations, which are left to the UERC RE Regulations. Matters up to 31 March 2025, including review matters, remain governed by the earlier regulations (p2).
These provisions create the multi-year process around the ARR: annual performance review and truing-up, sharing of gains and losses on uncontrollable factors (passed through in tariff) and on controllable factors (a portion passed on as a rebate or allowed in tariffs, the balance absorbed by the applicant) (p25), periodicity of tariff determination (ordinarily not more than once a year, except fuel-surcharge changes) (p26), the contents of a tariff petition — current and proposed tariffs, subsidy and cross-subsidy computations, voltage-wise cost of supply and revenue-impact statements (pp26–27), end-of-control-period review, order timelines, and publication and communication of tariff orders (pp28–30).
Part III (from p30) sets the financial principles: capital cost and capital structure, with separate treatment for existing and new projects, additional capitalisation and de-capitalisation, renovation and modernisation, in-principle approval of capital cost and financing plans, and prudence check against benchmark norms to be specified by the Commission from time to time (pp30–32).
Read with this
Commencement notices and reasons
- Dated 17 Sep 2024Multi Year Tariff Regulations, 2024 — Statement of Reasons
Procedures and orders made under it
- Date not statedFormats for Hydro
- Date not statedTransmission Formats
- Date not statedSLDC Formats
- Date not statedDistribution Formats
- Date not statedFormats for Thermal/Gas
One more document belongs here and is not on Voltaic: a copy in another language.
Voltaic last read UERC's website for final documents on 24 Nov 2026. A document UERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of UERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.