UERC · Uttarakhand Electricity Regulatory Commission
Terms and Conditions for Determination of Multi Year Tariff (Second Amendment) Regulations, 2023
UERC (Terms and Conditions for Determination of Multi Year Tariff) (Second Amendment) Regulations, 2023
AmendmentDated 16 Aug 2023In force from 1 Sep 2023No. F-9(32)(ii)/RG/UERC/2023/537 dated August 16, 2023
Replaced by Terms and Conditions for Determination of Multi Year Tariff Regulations, 2024
See that regulation for the date it took effect and for anything it keeps in force.
Amends a regulation Voltaic does not hold.
Summary
Summary written by software. Check the regulator's original before you rely on it.
The Uttarakhand Electricity Regulatory Commission substitutes Regulation 83 of its Multi Year Tariff Regulations, 2021 in full, replacing the earlier fuel and power purchase cost adjustment (FPPCA) provision with a self-contained recovery mechanism (p1). The notification is dated 16 August 2023, applies throughout Uttarakhand, and takes effect from 1 September 2023 (p1).
The new Regulation 83 makes the FPPCA charge applicable to the licensee's entire sale with no consumer exempt, and requires it to be built on actual — not estimated — variation in fuel and own-generation costs and in power purchase cost at the distribution periphery, including inter-state and intra-state transmission charges (p1–2).
On timing, FPPCA for month n is charged from month n+2 without prior Commission approval; under- and over-recoveries are carried into the next consumption month and must be squared up within the following quarter, failing which the licensee uses the regulatory process (p1). The licensee files quarterly details, computations and supporting documents within 45 days of the end of the following quarter for post facto approval; the Commission examines and approves with modifications, typically before the end of the third quarter, and any variation is adjusted in later months (p2). Charging unjustified FPPCA for three consecutive months triggers adjustment with interest that cannot be passed through (p2).
The regulation prescribes the computation formula FPPCA = C + B, decomposing C into own-generation cost change and power-purchase cost change, and excludes transmission losses (as approved in the tariff order) and DSM/under- or over-drawal penalties from the computation (p2–3). Category-wise FPPCA is derived from each category's approved Average Billing Rate relative to the licensee's overall ABR, and a ceiling applies per category with the excess carried forward (p3). Failure to compute and charge within the prescribed timeline forfeits recovery, except in force majeure (p3). Licensees must notify charges a week in advance, upgrade billing and IT systems to show FPPCA separately, display computations and collections on their website, and report month-wise figures in the next tariff petition (p2–3).
Read with this
Voltaic does not hold the regulation itself.
Amendments and corrections
Commencement notices and reasons
2 more documents belong here and are not on Voltaic: 2 copies in another language.
Voltaic last read UERC's website for final documents on 24 Nov 2026. A document UERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.