KERC · Karnataka Electricity Regulatory Commission
Draft Karnataka Electricity Grid Code (KEGC) Regulations, 2024
Karnataka Electricity Regulatory Commission (Karnataka Electricity Grid Code) Regulations, 2024
Draft codeDated 20 Jan 2025KERC/KEGC/2024-25/1346 dated 20.01.2025
Draft
A proposal that has since been finalised as the Karnataka Electricity Grid Code (KEGC), 2025.
Summary
Summary written by software. Check the regulator's original before you rely on it.
The Karnataka Electricity Regulatory Commission has issued this draft as notification KERC/KEGC/2024-25/1346 dated 20 January 2025 and invites comments, views, suggestions and objections by 21 February 2025 to the Secretary, KERC (p1, p6). It is a full replacement of the State grid code, prepared after KPTCL proposed clause-wise revisions to align KEGC 2015 with the CERC Indian Electricity Grid Code 2023, with input from the Grid Code Review Panel constituted under KEGC 2015 (p4–5). The preamble frames it as the instrument through which participants in the intra-State transmission system (In-STS) plan, develop, maintain and operate the State grid in coordination with the regional and national grids, with emphasis on renewable integration, reserves and clean-energy transition (p4–5).
Chapter 1 (pp6–21) sets the title — the KERC (Karnataka Electricity Grid Code) Regulations, 2024 — commencement on Gazette publication, supersession of KEGC 2015, the entities bound, the chapter structure and a long definition list, with a proviso that gaps are filled by the IEGC (p6). Chapter 2 (pp21–38) builds the governance layer: a re-constituted Grid Code Review Panel chaired by STU's Director (Transmission), with an Operation Coordination Committee and a Protection and Communication Coordination Committee beneath it, and sets out the roles of SLDC, ALDC, DCC, STU, transmission and distribution licensees, users and Qualifying Coordinating Agencies, plus dispute settlement, IEGC compatibility and compliance monitoring with penalties for non-compliance.
Chapter 3 (pp38–40) is the resource planning code, tying demand forecasting, generation resource adequacy and transmission resource adequacy assessment to the State's resource adequacy framework regulations and CEA transmission planning criteria. Chapter 4 (pp40–44) is the connection code — application procedure, connectivity agreement contents, a model agreement for Commission approval, and data and communication requirements, layered on an extensive list of CEA, CERC and KERC instruments. Chapter 5 (pp44–61) is the commissioning and commercial operation code: start-up power and infirm power windows, data to be furnished before trial run, notice periods, trial-run requirements by technology (thermal, hydro, wind/solar/ESS/hybrid, transmission elements, HVDC and FACTS), tests and documents before commercial operation, and the certificate and declaration mechanics for COD.
Chapter 6 (pp61–108) is the operating code: operating states and system security, under-frequency and islanding schemes, frequency control and the primary, secondary, tertiary, black-start and voltage reserve framework, operational and outage planning, restoration and black-start procedures, real-time operation, congestion management, demand management and curtailment, load-crash handling, post-despatch analysis and event reporting, periodic reports, voltage and reactive power management including reactive energy charging and pool settlement, periodic testing of elements, and certification of despatch-centre personnel.
Chapter 7 (pp108–137) is the scheduling and despatch code: applicability, control-area jurisdiction, SLDC and buyer/seller responsibilities, declared capacity and ramp declarations, merit-order load-generation balance, the D-1 scheduling timeline from capability declaration to final schedules, day-ahead, real-time and TRAS market interfaces, curtailment priority and revision rules, GD-5 treatment, metering and energy accounting, and hydro scheduling.
Chapters 8–11 (pp138–155) cover protection (protocol, settings, annual and third-party audit, system protection schemes, recording instruments, a protection application department and performance indices), cyber security and communication (system boundary, testing and audit, fault reporting, availability targets and cyber security duties), monitoring and compliance (self-audit and independent third-party audit) and miscellaneous matters — power to relax, power to remove difficulty, repeal and savings, suo motu orders, and a clause that the code is not treated as change in law. The annexures (pp155–160) carry the site responsibility schedule, the secondary and tertiary reserve assessment methodology, the accounting and pool settlement framework, and a table of procedures and guidelines to be issued after notification with deadlines and responsible agencies.
Read with this
The regulation
- Dated 17 Jul 2025Karnataka Electricity Grid Code (KEGC), 2025
Other copies of these documents (1)
- Dated 17 Jul 2025Karnataka Electricity Grid Code, 2025
One more document belongs here and is not on Voltaic: a copy in another language.
Voltaic last read KERC's website for final documents on 24 Nov 2026 (3 pages) and for drafts on 23 Nov 2026. A document KERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.