Skip to content

KERC · Karnataka Electricity Regulatory Commission

Karnataka Electricity Grid Code, 2025

Karnataka Electricity Regulatory Commission (Karnataka Electricity Grid Code) Regulations, 2025

Regulation · CopyDated 17 Jul 2025Published in the Gazette 21 Jul 2025KERC/KEGC/2025-26/514 dated 17.07.2025

The copy of the Karnataka Electricity Grid Code (KEGC), 2025.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on kerc.karnataka.gov.in ↗

Summary

Summary written by software, from pages 1 to 37 of 159. Check the regulator's original before you rely on it.

The Karnataka Electricity Regulatory Commission notification KERC/KEGC/2025-26/514 dated 17 July 2025 publishes the Karnataka Electricity Grid Code (KEGC), 2025, a principal state grid code made under s.86(1)(h) and s.181(2)(zp) of the Electricity Act, 2003 (p1, p5). It is to come into force on publication in the Karnataka Gazette and supersedes KEGC 2015; where KEGC 2025 is silent, IEGC applies, and IEGC prevails on inter-State transmission matters (p4–6, p36). The preamble explains the revision background, including KPTCL's proposal, review by the KEGC 2015 Grid Code Review Panel, a 2024 draft, and a public hearing on 08.04.2025 (p4–5). Chapter 1 gives short title, commencement, scope and definitions. Scope covers generators connected to In-STS, transmission licensees/STU, SLDC/ALDC/DCC, distribution licensees including deemed ones, SEZs and Indian Railways, open access/EHV consumers, RE generators and solar/wind/hybrid parks, and QCAs, with a Commission power to relieve obligations (p6). Chapter 2 establishes the Grid Code Review Panel and two functional committees — OCC and PCCC — with their composition, meeting cycles and functions (p20–29). It then allocates roles and duties to SLDC, ALDC, DCC, STU, transmission licensees, distribution licensees, users/generators and QCAs (p29–36), and sets dispute settlement, IEGC compatibility and compliance monitoring, including financial penalty and possible disconnection for persistent non-compliance (p36–37). Chapter 3 begins the Resource Planning Code, requiring resource adequacy assessment and distribution licensees' resource adequacy plans under the KERC Resource Adequacy Framework Regulations 2024 (p37). The contents pages map later chapters on connection, commercial operation, operating, scheduling and despatch, protection, cyber security/communication, monitoring and miscellaneous (p1–4).

Standard name
Grid Code
Primary topics
Grid operation and grid code, Scheduling and despatch, Connectivity and GNA

Read with this

The regulation

One more document belongs here and is not on Voltaic: a copy in another language.

Voltaic last read KERC's website for final documents on 24 Nov 2026 (3 pages) and for drafts on 23 Nov 2026. A document KERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on kerc.karnataka.gov.in ↗

Report an issue with this document