KERC · Karnataka Electricity Regulatory Commission
Karnataka Electricity Grid Code (KEGC), 2025
Karnataka Electricity Regulatory Commission (Karnataka Electricity Grid Code) Regulations, 2025
RegulationDated 17 Jul 2025KERC/KEGC/2025-26/514 dated 17.07.2025
Summary
Summary written by software, from pages 1 to 40 of 172. Check the regulator's original before you rely on it.
KERC's notification KERC/KEGC/2025-26/514 dated 17.07.2025 (p1) issues the Karnataka Electricity Grid Code (KEGC) 2025, a complete replacement for the KEGC 2015 notified on 02.02.2016. The Code was drafted to align the State grid code with CERC's IEGC 2023 (notified 11.07.2023), which KPTCL was asked to track clause by clause; a draft 2024 code was put out for comments and a public hearing was held on 08.04.2025 (pp4–5). It is made under s.86(1)(h) and s.181(2)(zp) of the Electricity Act, 2003 and comes into force on publication in the Karnataka Gazette — the Gazette date is not printed (p5).
The supplied extract covers the front matter, the Contents (pp1–3), Chapter 1 Preliminary (pp5–21) and Chapter 2 (pp22–40), and opens Chapter 3 at p40. The Contents index shows the Code runs to eleven chapters: after Preliminary, it takes in management of the code and the roles of organisations, resource planning, connection, commissioning and commercial operation, operating, scheduling and despatch, protection, cyber security and communication, monitoring and compliance, and miscellaneous (pp1–3, with chapter summaries at pp6–8).
Chapter 1 sets the short title, the Gazette-based commencement, the supersession of KEGC 2015, an IEGC gap-filling rule, the scope of application — all generators, transmission and distribution licensees, SLDC/ALDC/DCC, open access and EHV consumers, RE generators and parks, and QCAs connected to the intra-State system — and a definitions table of 164 terms (pp5–21).
It reconstitutes the Grid Code Review Panel under STU with defined membership and an amendment cycle ending in Commission approval after public hearing (pp23–26); creates the Operation Coordination Committee and the Protection and Communication Coordination Committee with their own membership, meeting cadence and work lists (pp26–31); states the statutory roles of SLDC, ALDC, DCC, STU, transmission and distribution licensees, Users, generators and RE developers, and QCAs (pp31–38); routes disputes to the Commission with the Code prevailing over contracts (p39); records IEGC precedence for inter-State matters (p39); and sets out compliance monitoring, penalty referral, possible disconnection and third-party audit (pp39–40). Chapter 3 opens the resource-planning obligations, tying distribution licensees' Resource Adequacy Plans to KERC's Resource Adequacy Framework Regulations 2024 (p40).
Read with this
Other copies of these documents (1)
- Dated 17 Jul 2025Karnataka Electricity Grid Code, 2025
Earlier drafts
- Dated 20 Jan 2025Draft Karnataka Electricity Grid Code (KEGC) Regulations, 2024
One more document belongs here and is not on Voltaic: a copy in another language.
Voltaic last read KERC's website for final documents on 24 Nov 2026 (3 pages) and for drafts on 23 Nov 2026. A document KERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of KERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.