Skip to content

KERC · Karnataka Electricity Regulatory Commission

Karnataka Electricity Grid Code (KEGC), 2025

Karnataka Electricity Regulatory Commission (Karnataka Electricity Grid Code) Regulations, 2025

RegulationDated 17 Jul 2025KERC/KEGC/2025-26/514 dated 17.07.2025

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on kerc.karnataka.gov.in ↗

Summary

Summary written by software, from pages 1 to 40 of 172. Check the regulator's original before you rely on it.

KERC's notification KERC/KEGC/2025-26/514 dated 17.07.2025 (p1) issues the Karnataka Electricity Grid Code (KEGC) 2025, a complete replacement for the KEGC 2015 notified on 02.02.2016. The Code was drafted to align the State grid code with CERC's IEGC 2023 (notified 11.07.2023), which KPTCL was asked to track clause by clause; a draft 2024 code was put out for comments and a public hearing was held on 08.04.2025 (pp4–5). It is made under s.86(1)(h) and s.181(2)(zp) of the Electricity Act, 2003 and comes into force on publication in the Karnataka Gazette — the Gazette date is not printed (p5).

The supplied extract covers the front matter, the Contents (pp1–3), Chapter 1 Preliminary (pp5–21) and Chapter 2 (pp22–40), and opens Chapter 3 at p40. The Contents index shows the Code runs to eleven chapters: after Preliminary, it takes in management of the code and the roles of organisations, resource planning, connection, commissioning and commercial operation, operating, scheduling and despatch, protection, cyber security and communication, monitoring and compliance, and miscellaneous (pp1–3, with chapter summaries at pp6–8).

Chapter 1 sets the short title, the Gazette-based commencement, the supersession of KEGC 2015, an IEGC gap-filling rule, the scope of application — all generators, transmission and distribution licensees, SLDC/ALDC/DCC, open access and EHV consumers, RE generators and parks, and QCAs connected to the intra-State system — and a definitions table of 164 terms (pp5–21).

It reconstitutes the Grid Code Review Panel under STU with defined membership and an amendment cycle ending in Commission approval after public hearing (pp23–26); creates the Operation Coordination Committee and the Protection and Communication Coordination Committee with their own membership, meeting cadence and work lists (pp26–31); states the statutory roles of SLDC, ALDC, DCC, STU, transmission and distribution licensees, Users, generators and RE developers, and QCAs (pp31–38); routes disputes to the Commission with the Code prevailing over contracts (p39); records IEGC precedence for inter-State matters (p39); and sets out compliance monitoring, penalty referral, possible disconnection and third-party audit (pp39–40). Chapter 3 opens the resource-planning obligations, tying distribution licensees' Resource Adequacy Plans to KERC's Resource Adequacy Framework Regulations 2024 (p40).

Standard name
Grid Code
Primary topics
Grid operation and grid code, Technical standards, Scheduling and despatch

Read with this

Other copies of these documents (1)

One more document belongs here and is not on Voltaic: a copy in another language.

Voltaic last read KERC's website for final documents on 24 Nov 2026 (3 pages) and for drafts on 23 Nov 2026. A document KERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of KERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on kerc.karnataka.gov.in ↗

Report an issue with this document