MERC · Maharashtra Electricity Regulatory Commission
Renewable Purchase Obligation, its Compliance and REC Framework Implementation Regulations, 2016 — Draft
Maharashtra Electricity Regulatory Commission (Renewable Purchase Obligation, its compliance and REC framework Implementation) Regulations, 2016
Draft regulationReleased with the notice dated 24 Dec 2015
Draft
A proposal, not law. Voltaic holds no final regulation made from this draft.
Summary
Summary written by software. Check the regulator's original before you rely on it.
Principal MERC regulation creating Maharashtra's Renewable Purchase Obligation framework for the four years from 1 April 2016 to 31 March 2020 (p5). It is made under sections 61, 66, 86(1)(e) and 181 of the Electricity Act 2003, extends to the whole State, and comes into force on Gazette publication (p2).
Part A (p4) sets the scope: the regulation applies wherever the Commission specifies a renewable procurement percentage based on total consumption, and binds distribution licensees, captive users and open access consumers.
Part B (p4–8) is the operative core. Regulation 4 defines the eligible RE sources — MNRE-recognised technologies, with a minimum grid-connected capacity of 250 kW unless smaller projects have metering and communication arrangements with the SLDC; rooftop solar recognised under the 2015 net-metering regulations counts for compliance. Regulation 5 fixes who is obligated: captive plants of 1 MW and above running on conventional fossil fuel, and open access consumers with contract demand of 1 MVA and above, with standby or emergency captive plant excluded. Regulation 7 sets year-wise solar, non-solar and composite RPO percentages on total procurement, carves a slice of the non-solar obligation out for mini/micro hydro purchase, and gives entities in the 1–5 MW/MVA band a lighter regime under which only the composite target applies. Obligations can be met through own generation, procurement or RECs (Reg 7.2, 8), with solar and non-solar obligations kept strictly separate. Regulations 9–11 make MEDA the State Agency for computation, monthly publication and quarterly reporting of compliance, and require licensees, captive users and open access consumers to file procurement data. Regulation 12 imposes RPO regulatory charges on shortfalls; Regulation 13 sets up a Monitoring Committee under the Grid Coordination Committee.
Part C (p8–9) gives RE projects commissioned during the operating period a one-time choice between Commission-determined preferential tariff and the REC route, locked in for the tariff period or PPA. Part D (p9) allocates evacuation costs either side of the interconnection point and provides relax, amend and remove-difficulty powers.
Read with this
The regulation
Proposed changes (drafts with no final yet)
- Dated 24 Dec 2015Public notice: Public Notice — Draft Renewable Purchase Obligation, its compliance and REC framework Implementation Regulations, 2016
- Released with the notice dated 24 Dec 2015Explanatory memorandum: RPO and REC Framework Implementation Regulations, 2016 — Explanatory Memorandum — Draft
2 more documents belong here and are not on Voltaic: 1 copy in another language and 1 draft or notice on a draft not held as English text.
Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.