Skip to content

MERC · Maharashtra Electricity Regulatory Commission

Renewable Purchase Obligation, its compliance and REC Framework Implementation Regulations, 2010

Maharashtra Electricity Regulatory Commission (Renewable Purchase Obligation, its compliance and REC framework Implementation) Regulations, 2010

RegulationDated 7 Jun 2010No.MERC/Legal/2010/483 dated June 7, 2010

Replaced by RPO REC Regulations, 2016 and Renewable Purchase Obligation, its Compliance and Implementation of REC Framework Regulations, 2016

See those regulations for the date they took effect and for anything they keep in force.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on merc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

These are MERC's principal RPO Regulations, made under ss.61, 66, 86(1)(e) and 181 of the Electricity Act, 2003 (p3). They extend to the whole of Maharashtra and bind distribution licensees, captive users and open access consumers (p3, p5). They take effect from publication in the Official Gazette — no Gazette date is printed — and carry a signature date of June 7, 2010 (p3, p12).

Part A (p5) states the scope: promoting renewable generation and co-generation and specifying a procurement percentage measured against a distribution licensee's total consumption.

Part B (pp5–10) is the operative core. It defines eligible renewable sources, sets the installed-capacity and metering conditions for eligibility, and specifies which captive users and open access consumers fall inside the obligation and at what capacity/contract-demand thresholds (pp5–7). It fixes an operating period ending with FY 2015-16 and gives the year-wise solar and non-solar RPO trajectory (p7). Compliance may come from own generation, direct procurement, purchase from other licensees, RECs or a combination, with separate solar and non-solar certificate obligations (pp7–8). The State Agency is charged with accreditation, recommending registration, data collection, monthly publication of compliance and quarterly reporting to the Commission (pp8–9); distribution licensees and captive/open access consumers have their own reporting and audit duties (p9). Shortfalls attract RPO Regulatory Charges paid into a ring-fenced fund, and a Monitoring Committee under the GCC oversees implementation (p10).

Part C (pp10–11) sets pricing: new RE projects choose between preferential tariff and the REC route and are then locked in; REC pricing separates the electricity component (pooled cost of power purchase of the host utility) from the certificate component discovered on the power exchange, subject to CERC floor and forbearance prices; existing projects keep their tariff orders and may enter the REC route only after PPA expiry.

Part D (pp11–12) allocates grid connectivity cost either side of the interconnection point and reserves powers to relax, amend and remove difficulties.

Standard name
RPO Regulations, REC Regulations
Primary topics
Renewable purchase obligation (RPO / RCO), Renewable energy certificates (REC), Renewable energy tariff

Read with this

Proposed changes (drafts with no final yet)

2 more documents belong here and are not on Voltaic: 1 copy in another language and 1 draft or notice on a draft not held as English text.

Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on merc.gov.in ↗