Skip to content

MERC · Maharashtra Electricity Regulatory Commission

RPO and REC Framework Implementation Regulations, 2016 — Explanatory Memorandum — Draft

Explanatory Memorandum for the proposed draft of the Maharashtra Electricity Regulatory Commission (Renewable Purchase Obligation, its compliance and REC framework Implementation) Regulations, 2016

Explanatory memorandum to a draftReleased with the notice dated 24 Dec 2015

Draft

Voltaic holds no final regulation made from this draft.

Explanatory memorandum to the Renewable Purchase Obligation, its Compliance and REC Framework Implementation Regulations, 2016 — Draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on merc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Commission's explanatory memorandum for the proposed draft MERC (Renewable Purchase Obligation, its compliance and REC framework Implementation) Regulations, 2016. It explains why the 2010 RPO-REC Regulations need to be amended as their operating period ends on 31 March 2016, and records the ATE's direction that RPO targets be decided before the MYT period begins (p1).

The memorandum walks through the proposed amendments. Regulation 5.1 would be clarified so that the 1 MW captive-plant condition applies to captive generation based on conventional fossil fuel (p1–2). Regulation 6 would give the RPO framework a four-year run from 1 April 2016 to 31 March 2020, co-terminus with the new MYT control period (p2). Regulation 7 would continue technology-specific solar, non-solar and mini/micro hydro targets, but allow smaller obligated entities to meet a single composite target; the memorandum sets out the threshold categories for that option (p3).

Most of the document is the RPO assessment for the new control period (p3–9). It draws on the NAPCC, the National Tariff Policy, the Government of Maharashtra's renewable policy, installed capacity, projected capacity addition, RE availability and the 18th Electric Power Survey energy requirement. Nine tables build the proposed year-wise solar, non-solar and total RPO trajectories, and the draft Regulation 7.1 text repeats the target table. A mini/micro hydro sub-target for distribution licensees and two new provisos — one for MNRE-scheme procurement and one on pass-through of RPO regulatory charges — are also proposed (p8–9). The memorandum closes by saying the draft 2016 Regulations have been issued (p10).

Standard name
RPO Regulations, REC Regulations
Primary topics
Renewable purchase obligation (RPO / RCO)

Read with this

2 more documents belong here and are not on Voltaic: 1 copy in another language and 1 draft or notice on a draft not held as English text.

Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on merc.gov.in ↗

Report an issue with this document