Skip to content

HPERC · Himachal Pradesh Electricity Regulatory Commission

Draft Terms and Conditions for Green Energy Open Access and Banking Regulations, 2024

Himachal Pradesh Electricity Regulatory Commission (Terms and Conditions for Green Energy Open Access and Banking) Regulations, 2024

Draft regulationDated 2 Aug 2024No. HPERC/ED(T)/D(TE)/GEOA/38-2024- dated 02nd August, 2024

Draft

A proposal that has since been finalised as the Green Energy Open Access and Banking Regulations, 2024.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on hperc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a draft principal regulation issued by the Himachal Pradesh Electricity Regulatory Commission, Shimla, on 02 August 2024, publishing the proposed HPERC (Terms and Conditions for Green Energy Open Access and Banking) Regulations, 2024 for objections and suggestions (p1). It is proposed under section 181 read with sections 39, 40, 42, 61 and 86 of the Electricity Act, 2003, to give effect to the Central Green Energy Open Access Rules, 2022 within Himachal Pradesh (p1). The draft applies to connectivity and open access for electricity from green/renewable sources, including non-fossil waste-to-energy, using intra-state transmission or distribution systems, including in conjunction with inter-state transmission; it will come into force on a date the Commission notifies (p1–2).

Regulations 1–2 set the title, state-wide extent, application and definitions, including Green Energy, GEOA, banking, eligible entity, GOAR portal, obligated entity and standby charges (p1–5). Regulation 3 designates HPSLDC as State Nodal Agency for short-term GEOA and HPPTCL/STU for medium- and long-term GEOA (p5). Regulation 4 classifies GEOA by duration into long-, medium- and short-term categories (p5). Regulation 5 sets eligibility, including the load threshold for non-captive consumers and no load limit for captive consumers, and restrictions for generators with existing PPAs; it also covers consumer requisitions to distribution licensees for green energy and RPO accounting (p5–6). Regulation 6 preserves existing GEOA agreements during their term while future renewals or additional capacity fall under these regulations (p6–7).

Regulations 7–10 deal with system criteria and process: long-term access follows State Grid Code planning criteria; short/medium-term uses spare margins; curtailment priority puts non-green open access ahead of green open access and the distribution licensee last (p7). The State Nodal Agencies must prepare a detailed procedure within 30 days for approval; applicants register on the GOAR portal, applications go via the Central Nodal Agency, and State Nodal Agencies must decide within 15 days, with deemed approval and first-in-first-out processing (p7–8). Metering follows CEA meter regulations and must communicate real-time readings to SLDC (p8).

Regulation 11 is the charging framework: transmission, wheeling, cross-subsidy, additional, standby, banking and other fees/charges are to be determined by the Commission, with sub-rules on dedicated lines, losses, exemptions for waste-to-energy, green hydrogen/ammonia and offshore wind, standby charges, monthly banking, permitted banked quantum and in-kind banking charges (p8–12). Regulations 12–15 require green certificates, collection and disbursement through the State Nodal Agency, dispute resolution with CGRF/Commission appeals, and SLDC/licensee reporting (p12–13). Regulations 16–20 give the Commission powers to issue directions, relax provisions, remove difficulties, amend the regulations and preserve savings (p13–14).

Standard name
Green Energy Open Access Regulations, Energy Banking
Primary topics
Green energy open access, Energy banking, Open access charges

Read with this

The regulation

Commencement notices and reasons

Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on hperc.org ↗

Report an issue with this document