Green Energy Open Access and Banking Regulations, 2024 — Finalization Order
Finalization of the Himachal Pradesh Electricity Regulatory Commission (Terms and Conditions for Green Energy Open Access and Banking) Regulations, 2024.
OrderDated 17 Dec 2024
Read with the Green Energy Open Access and Banking Regulations, 2024.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is HPERC's finalisation order on the draft Himachal Pradesh Electricity Regulatory Commission (Terms and Conditions for Green Energy Open Access and Banking) Regulations, 2024. It records the pre-publication process: the draft was notified on 02 Aug 2024, published in the Rajpatra on 06 Aug 2024, public notice invited objections by 05 Sep 2024, and a public hearing was held on 07 Sep 2024 (p1–3). It lists written submissions from HPSEBL, HPSLDC, IEX, industrial consumers and others (p3), and annexes the hearing participants (p62).
The body is a regulation-by-regulation review of stakeholder objections and Commission decisions. For Regulation 2, the Commission adds a definition of 'Entity' keyed to 100 kW or more demand/load, except captive consumers with no load limit, and retains other definitions (p4–7). Regulation 3 is retained: HPPTCL/STU is the State Nodal Agency for medium/long-term green energy open access, with DISCOM nodal agency coordination, and a detailed procedure is to be prepared within 30 days of notification (p7–10). Regulation 4 categories are retained to align with existing HPERC open access regulations, despite IEX's request to extend short-term access to eleven months (p10–16). Regulation 5 eligibility and purchase options are retained (p16–22); Regulation 7 criteria are retained (p23–24); Regulation 9 procedure is retained, with Grid Controller of India added and the 12-time-block uniform demand requirement kept (p25–29); Regulation 10 metering/DSM is retained (p29–31).
Charges and banking are where most changes occur. Cross-subsidy surcharge treatment is retained (p31–33); a proviso is inserted exempting captive green energy open access consumers from additional surcharge (p33–38); standby charges are modified to apply only to green energy open access consumers who are not DISCOM consumers (p38–42); and banking provisions are re-drafted — monthly banking, banked quantum linked to consumption directly procured from DISCOM excluding open access/captive energy, TOD withdrawal restrictions, lapse and REC treatment (p42–57). Regulation 12 green certificates are declined (p57–58); Regulation 13 adds collection by DISCOM with HPSLDC verified data (p58–60); Regulation 14 dispute resolution is modified (p60–61). The Commission decides to finalise and notify the Regulations, publish them in Rajpatra, with commencement on a date it may specify (p61). The order was announced 17.12.2024 (p61).
Read with this
The regulation
- Dated 17 Dec 2024Green Energy Open Access and Banking Regulations, 2024
Earlier drafts
Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.