MPERC · Madhya Pradesh Electricity Regulatory Commission

Security Deposit (Revision–I) Regulations, 2009

Madhya Pradesh Electricity Regulatory Commission (Security Deposit) (Revision–I) Regulations, 2009 {RG-17(I) of 2009}

RegulationDated 4 Sep 2009No.1783/ MPERC/2009

4 amendments to it are on Voltaic, the latest dated 19 Jun 2025.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on mperc.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Madhya Pradesh Electricity Regulatory Commission's Security Deposit (Revision–I) Regulations, 2009 replace the Commission's 2004 security deposit regulations and set out, for the whole State, how distribution licensees may take, hold, review, pay interest on and refund security deposits from consumers (p1). They are made under s.181(1) and s.181(2)(v)–(w) read with s.47 of the Electricity Act, 2003 and take effect from Gazette publication; the Gazette date itself is not printed (p1).

The opening clauses give the short title, the consumers covered — existing and prospective consumers across the State — and the commencement rule, define 'default', and fall back on the Electricity Act, the MP Vidyut Sudhar Adhiniyam, 2000 and the MP Electricity Supply Code, 2004 for undefined terms (p1). Clauses 1.6–1.7 let a licensee collect deposits against meters, lines and plants, and consumption; they list the payment instruments accepted and give EHT/HT consumers a choice of options — cash, part cash with a pledged bank fixed deposit, or cash with a large interim payment each billing month — while consumers in default lose those options and existing consumers converting from Bank Guarantee may pay in instalments (p1–2).

Separate heads follow for deposit against lines/plants for new supply, Meter Security Deposit (p3), and the initial energy security deposit for new connections, which is worked out from estimated consumption in days or in units by consumer category, with notified rural areas on half the urban basis (p3–5). A pre-payment scheme for LT consumers is mandated, and those consumers are exempt from the energy security deposit (p4). Additional deposits are reviewed each April against the previous year's consumption, may be demanded in instalments, are escalated where a consumer defaults repeatedly, and are credited back with interest where the deposit held is excessive (p5–6). Interest on cash deposits, its monthly adjustment through bills, penal interest for delay, and refund on reduced contract demand or termination with outer time limits are then prescribed (p6). Closing clauses give the Commission power to amend, preserve its inherent powers, and supersede the 2004 Regulations (p6–7).

Standard name
Security Deposit
Primary topics
Security deposit, Metering, New connections and load changes

Read with this

Other copies of these documents (1)

5 more documents belong here and are not on Voltaic: 5 copies in another language.

Voltaic last read MPERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (4 pages). A document MPERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of MPERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on mperc.in ↗

Report an issue with this document