Skip to content

MPERC · Madhya Pradesh Electricity Regulatory Commission

Security Deposit (Revision-I) (Third Amendment) Regulations, 2009

Madhya Pradesh Electricity Regulatory Commission (Security Deposit) (Revision-I) (Third Amendment) Regulations, 2009

AmendmentDated 24 May 2024No 1238/MPERC/2024 dated 24th May 2024

Amends the Security Deposit (Revision–I) Regulations, 2009.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on mperc.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Madhya Pradesh Electricity Regulatory Commission issued this one-page amendment (No. 1238/MPERC/2024, dated 24 May 2024) to the MPERC (Security Deposit) (Revision-I) Regulations, 2009, substituting Regulation 1.22 (p1).

The replacement clause requires the licensee to pay interest, at the RBI Bank Rate prevailing on 1 April of the financial year concerned, on cash security deposits taken from consumers; the licensee must itself ascertain the prevailing Bank Rate and inform consumers through the billing mechanism (p1). Two provisos fix when interest runs — from receipt of the deposit until it is retained — and require the portion accruing before the first billing month to be credited in the consumer's first bill (p1).

It extends to the whole of Madhya Pradesh and takes effect from publication in the Official Gazette, whose date is not printed (p1).

Standard name
Security Deposit
Primary topics
Security deposit

Read with this

The regulation

Other copies of these documents (1)

5 more documents belong here and are not on Voltaic: 5 copies in another language.

Voltaic last read MPERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (4 pages). A document MPERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on mperc.in ↗

Report an issue with this document