MPERC · Madhya Pradesh Electricity Regulatory Commission
Security Deposit (Revision-I) (Fourth Amendment) Regulations, 2009
Madhya Pradesh Electricity Regulatory Commission (Security Deposit) (Revision-I) (Fourth Amendment) Regulations, 2009 {ARG- 17(I)(iv) of 2025}
Amendment · Gazette copyDated 19 Jun 2025No. 1159/MPERC/2025 dated 19th June 2025
The Gazette copy of the Madhya Pradesh Security Deposit (Revision-I) (Fourth Amendment) Regulations, 2009.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the fourth amendment to the MPERC (Security Deposit) (Revision-I) Regulations, 2009, issued as No. 1159/MPERC/2025 from Bhopal on 19 June 2025 (p2). The surviving text begins with the enabling paragraph and ends with the Secretary's signature page. The Commission makes it under s.181(1) and s.181(2)(v) and (w) read with s.47 of the Electricity Act 2003 (p2).
The amendment substitutes two regulations of the Principal Regulations. New Regulation 1.20 deals with consumers who take additional sanctioned load: the additional security deposit is to be worked out as if the extra load were a new service. It then sets how a licensee must handle the opposite case — a reduction in contract demand — requiring recalculation of security and credit of any excess through adjustment across equal instalments in subsequent bills, with interest payable to the consumer on delay beyond a stated period, and ties the bank rate to the Reserve Bank of India Act, 1934 (p2–3).
New Regulation 1.25 governs refund of the security deposit on permanent disconnection, termination of agreement or cancellation of a new-service application, after dues are adjusted. It fixes a working-day deadline for refund, provides for interest to the consumer on delay beyond it, caps the overall refund period including delay, and authorises the Commission to impose a penalty on the licensee for breach (p3).
By its own terms it applies to the whole State of Madhya Pradesh and takes effect from publication in the State Gazette; the Gazette date is not printed in the text (p3). It is signed by UMAKANTA PANDA, Secretary (p3).
Read with this
The regulation
- Dated 4 Sep 2009Security Deposit (Revision–I) Regulations, 2009
Amendments and corrections
- Dated 20 Jul 2018Security Deposit (Revision-I) (First Amendment) Regulations, 2009
- Dated 15 Jul 2021Security Deposit (Revision-I) Regulations, 2009 — Second Amendment, 2021
- Dated 24 May 2024Security Deposit (Revision-I) (Third Amendment) Regulations, 2009
- Dated 19 Jun 2025Madhya Pradesh Security Deposit (Revision-I) (Fourth Amendment) Regulations, 2009
5 more documents belong here and are not on Voltaic: 5 copies in another language.
Voltaic last read MPERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (4 pages). A document MPERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.