Standards of Performance of Distribution Licensees (Removal of Difficulties) Order, 2026

Kerala State Electricity Regulatory Commission (Standards of Performance of Distribution Licensees) (Removal of Difficulties) Order, 2026

OrderDated 22 Sep 2026Published in the Gazette 28 Sep 2026No. 171/Con.Engg./2026/KSERC dated 22nd September, 2026

Made under the Standards of Performance of Distribution Licensees Regulations, 2015.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on dev.erckerala.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a short KSERC order issued on 22 September 2026 (Gazette Extraordinary No. 2585 dated 28 September 2026) to clean up two drafting defects in the Kerala State Electricity Regulatory Commission (Standards of Performance of Distribution Licensees) Regulations, 2015, which had come into force on 11 January 2016 (p1–2). The Commission records that it had already amended the principal Regulations to incorporate the Electricity (Rights of Consumers) Rules, 2020 and its Ministry of Power amendments, and had notified a First Amendment in the Gazette on 6 March 2026 (p2).

The order identifies two problems. First, a stray brackets-and-figure "(2)" crept into Regulation 19(1) ahead of clause (a), creating interpretive ambiguity; clause 2 omits it (p2). Second, when sub-regulations (15) and (16) of Regulation 4 on replacement of defective LT and HT meters were substituted, the matching Table under Regulation 5 and Schedule-I were updated but the corresponding column (2) entries against Serial Numbers 10 and 11 of Annexure II were left alone, leaving Annexure II inconsistent with the substantive provisions (p2). Clause 3 substitutes those two entries so that they now cross-refer to the replacement timelines in Regulations 117 and 118 of the Kerala Electricity Supply Code, 2014 (p3).

The order takes effect from the date of the order itself and is signed by the Secretary; it creates no new obligations, only textual consistency (p2–3).

Standard name
Standards of Performance
Primary topics
Standards of performance, Metering

Read with this

Voltaic last read KSERC's website for final documents on 24 Nov 2026. A document KSERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on dev.erckerala.org ↗

Report an issue with this document