KSERC · Kerala State Electricity Regulatory Commission
Standards of Performance of Distribution Licensees (First Amendment) Regulations, 2026
Kerala State Electricity Regulatory Commission (Standards of Performance of Distribution Licensees) (First Amendment) Regulations, 2026
Amendment · Gazette copyDated 5 Mar 2026Published in the Gazette 6 Mar 2026No. 171/Con.Engg/2026/KSERC dated 5th March, 2026
The Gazette copy of the Standards of Performance of Distribution Licensees Regulations, 2015 — First Amendment, 2026.
Summary
Summary written by software. Check the regulator's original before you rely on it.
The KSERC (Standards of Performance of Distribution Licensees) (First Amendment) Regulations, 2026 amend the 2015 principal regulations that set service standards for Kerala's distribution licensee under Section 57 of the Electricity Act, 2003 (p1). Issued as notification No. 171/Con.Engg/2026/KSERC dated 5 March 2026 and gazetted on 6 March 2026 (p1), they take effect from the date of publication in the Official Gazette (p2).
Regulation 2 rewrites or inserts definitions in Regulation 2 — 'applicant', 'consumer' (with a proviso giving prosumers registered under the 2025 renewable energy regulations the same rights), 'days', and the five reliability indices CAIDI, CAIFI, MAIFI, SAIDI and SAIFI, defined for 11 kV feeders excluding agricultural feeders (p2–4).
The rest of the package tightens operational standards. Regulation 4 is amended to add a 24×7 supply obligation and to require a scheme, within six months, for decommissioning consumer diesel generator sets in favour of cleaner backup such as renewable generation with battery storage (p4). Restoration timelines for fuse-off calls, overhead line/cable and transformer failures and voltage rectification are shortened, ASAI targets are raised, and meter replacement timelines are now tied to the Kerala Electricity Supply Code, 2014 (p4–6). The Overall Standards of Performance table in Regulation 5 is substituted (p6–7).
Regulation 6 requires a reliability trajectory study within one year and lets the Commission modify the SAIFI/SAIDI trajectories; Regulation 7 requires an online system for feeder-wise interruption data (p8–9). Regulation 14 adds an online compensation portal (six months), and new Regulation 14A creates an automatic compensation mechanism integrated with billing, with progressive expansion of parameters and half-yearly reporting (p9–11). Regulation 16 moves claims to the portal and shortens the licensee's decision window; Regulation 20 gives Commission-authorised officers access to meter data (p11–12).
Schedule-I, substituted wholesale, lists each breach, the relevant regulation, the compensation payable and whether the mode is manual or automatic (p12–15). Annexures I and II reporting formats replace 'complaints' with 'complaints/request for service' (p12). The Explanatory Note records the Electricity (Rights of Consumers) Rules, 2020 as the driver and the consultation: draft published 3 February 2026, public hearing 25 February 2026, ten attendees and six written submissions (p15–16).
Read with this
The regulation
- Dated 15 Dec 2015Standards of Performance of Distribution Licensees Regulations, 2015
Amendments and corrections
Procedures and orders made under it
Consolidated copies, for reference (1)
Voltaic last read KSERC's website for final documents on 24 Nov 2026. A document KSERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.