KSERC · Kerala State Electricity Regulatory Commission
Standards of Performance of Distribution Licensees Regulations, 2015
Kerala State Electricity Regulatory Commission (Standards of Performance of Distribution Licensees) Regulations, 2015
RegulationDated 15 Dec 2015No.1/1/KSERC -2015/ dated 15th December, 2015
1 amendment to it is on Voltaic, dated 5 Mar 2026.
Summary
Summary written by software, from pages 1 to 40 of 41. Check the regulator's original before you rely on it.
This is the Kerala State Electricity Regulatory Commission's principal regulation fixing the service standards every distribution licensee in the State must meet for consumers and users of its distribution system. It was issued by notification No.1/1/KSERC-2015 dated 15 December 2015 under clauses (za) and (zb) of s.181(2) of the Electricity Act 2003, applies to all distribution licensees including deemed licensees and to persons exempted under s.13 of the Act, and takes effect from the date of publication in the Government gazette — a date the text does not print (p1). The Explanatory Note records that it replaces the 2006 standards of performance regulations, after a draft published on 25 June 2015, a public hearing at Kalamassery on 3 August 2015 and a consultation with licensees on 16 November 2015, and cites the Forum of Regulators' model regulation as background (p24).
Chapter I (pp1–5) is preliminary: short title, extent, commencement, some 41 definitions, and an interpretation clause that subordinates the regulations to the Act and to CERC/CEA instruments.
Chapter II (pp5–16) is the operative core. Regulation 4 sets guaranteed standards — restoration times for fuse-off calls, overhead line/cable, underground cable and distribution transformer failures, graded by urban, rural and difficult area, with night-hour carve-outs and exclusions for statutory approvals; alternate supply; notice and duration limits for scheduled outages; service voltage levels with permissible variation and a graded complaint-resolution path; system frequency per the CERC Indian Electricity Grid Code; harmonics per the Kerala Electricity Supply Code 2014; a neutral-voltage limit with annual compliance testing; duties to keep consumers informed; adherence to Supply Code time lines for thirteen connection-related services; meter inspection and replacement deadlines; and an annual Average Service Availability Index (pp5–10). Regulations 5 and 6 set overall standards — aggregate targets for the guaranteed standards (pp10–11), plus billing efficiency, revenue collection efficiency, transformer failure rate, faulty-meter ceiling, reliability-index targets, call centres and consumer indexing (pp11–12). Regulation 7 gives the formulas and quarterly computation method for SAIFI, SAIDI, MAIFI, CAIFI and CAIDI (pp13–14); regulation 8 the call centre / consumer interface regime keyed to a consumer-strength threshold (pp14–15); regulation 9 the consumer-indexing deadlines (p15); regulations 10–13 cover accident reduction, special standards agreed in supply agreements, standards for s.13-exempted persons, and grounds for relaxation (pp15–16).
Chapter III (pp16–18) creates the compensation regime: compensation for breach at Schedule I rates, officers up to Executive Engineer rank empowered to sanction it, a three-tier route (licensee officer, Consumer Grievances Redressal Forum, Electricity Ombudsman) with filing and disposal time lines, an appeal to the Commission for enhancement, and exemption from compensation for outages hitting a cluster of more than 100 consumers.
Chapter IV (pp18–21) covers quarterly compliance reporting in Annexures I and II, compliance audit under the KSERC Compliance Audit Regulations 2012, grading of report reliability as A, B or C, and incentive/disincentive linked to average deviation from the overall standards and to the grade. Chapter V (pp21–23) prescribes complaint handling — call response, registration and complaint numbers, the required contents of the licensee's own complaint procedure, and a Manual of Procedure to be approved by the Commission and published in English and Malayalam. Chapter VI (pp23–25) requires consumer awareness measures, gives the Commission power to remove difficulties and to amend, and repeals the 2006 regulations with a savings clause.
Schedule I (pp25–26) lists compensation payable per type of breach; Forms A, B and C (pp27–29) are the compensation claim, CGRF application and Ombudsman appeal formats; Annexure I (pp30–36) and Annexure II (pp37–40) are the quarterly reporting formats for guaranteed and overall standards.
Read with this
Amendments and corrections
Procedures and orders made under it
Consolidated copies, for reference (1)
Other copies of these documents (1)
Voltaic last read KSERC's website for final documents on 24 Nov 2026. A document KSERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of KSERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.