TNERC · Tamil Nadu Electricity Regulatory Commission
Renewable Energy Purchase Obligation (Amendment) Regulation, 2025 — Draft
Tamil Nadu Electricity Regulatory Commission Obligation) (Amendment) Regulation, 2025
Draft amendmentDated 21 May 2025TNERC/RPO/1-2/2025 dated 21-05-2025
Draft
A proposal that has since been finalised as the Renewable Energy Purchase Obligation Regulations, 2023 — Amendment, 2025.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a draft amendment by the Tamil Nadu Electricity Regulatory Commission that would replace Annexure-I of the TNERC (Renewable Energy Purchase Obligation) Regulations, 2023 with a new year-wise RPO trajectory (p1–2). The draft is dated 21 May 2025, is open for objections or suggestions until 5 June 2025, and states that it will come into force from 1 April 2024 (p1). It would apply for the RPO years 2024-25 through 2029-30 (p2).
The operative part is short: clause 1 gives the title and commencement, and clause 2 substitutes Annexure-I (p1–2). The new Annexure-I sets minimum RPO percentages for each year, broken into wind, hydro, distributed, other and total renewable energy (p2). Its notes define which projects can count for each component: new wind and hydro projects commissioned after 31 March 2024; hydro including pumped storage, small hydro, free power and, with Central Government approval, projects outside India; distributed projects below 10 MW including solar net and gross metering; and an 'other' category for older wind and hydro projects (p2–3). The notes also provide multipliers where distributed-generation data are missing, flexibility to use excess wind, hydro or other energy against shortfalls in another component, treatment of designated consumers under the Energy Conservation Act, 2001, compliance through renewable energy certificates under CERC regulations, consequences of shortfall, and quarterly data reporting by TNGEC (p3–4).
The Explanatory Statement (p5–6) explains why: the 2023 RPO trajectory was based on the Ministry of Power's 2022 RPO order; the Ministry later notified a Renewable Consumption Obligation under the Energy Conservation Act, 2001 effective 1 April 2024 and clarified in April 2025 that earlier RPO notifications were superseded for designated consumers, including captive users. The draft therefore aligns the state RPO trajectory with that central framework and cites CEA resource adequacy reports using the RCO trajectory (p5–6).
Read with this
The regulation
- Dated 26 Oct 2023Renewable Energy Purchase Obligation Regulations, 2023
Amendments and corrections
Earlier drafts
- Dated 13 Jun 2023Renewable Energy Purchase Obligation Regulations, 2023 — Draft
- Dated 26 Jun 2024Renewable Energy Purchase Obligation (Amendment) Regulation, 2024 — Draft
One more document belongs here and is not on Voltaic: a copy in another language.
Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.