Skip to content

TNERC · Tamil Nadu Electricity Regulatory Commission

Renewable Energy Purchase Obligation Regulations, 2023 — Amendment, 2025

Tamil Nadu Electricity Regulatory Commission (Renewable Energy Purchase Obligation) (Amendment) Regulations, 2025

AmendmentDated 26 Aug 2025Published in the Gazette 24 Sep 2025In force from 1 Apr 2024Notification No.TNERC/RPO/1-2/2025 dated 26-08-2025

Amends the Renewable Energy Purchase Obligation Regulations, 2023.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on tnerc.tn.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a Tamil Nadu Electricity Regulatory Commission amendment that re-cuts the State's renewable purchase obligation to track the Union Ministry of Power's renewable consumption obligation. It was issued on 26 August 2025, signed on 4 September 2025 and gazetted on 24 September 2025 (p1–2, p4), yet is expressed to come into force from 1 April 2024 — the date the MoP's RCO notification took effect (p2).

Pages 2–4 carry the operative text. Regulation 4(3) is substituted so that the MoP's RCO and its conditions ordinarily apply to obligated entities and to designated consumers under the Energy Conservation Act, 2001, while reserving to the Commission the power to revise RPO/RCO percentages and conditions — on its own motion, on the State Agency's recommendation or on a distribution licensee's application — in which case the Commission's prescription prevails over the MoP's (p2). Regulation 9(2) is replaced to fix liability for non-compliance under section 142 of the Electricity Act or section 26 of the Energy Conservation Act, with a proviso allowing an obligated entity to seek carry-forward of its compliance requirement where certificates are unavailable (p2). Annexure-I is substituted with a fresh minimum-percentage table running 2024-25 to 2029-30, disaggregated into wind, hydro, distributed and other renewable energy, plus notes and sub-clauses that define which projects qualify for each bucket, how shortfalls and surpluses may be shifted between wind and hydro, how RECs count, and how TN SLDC/TNGEC must report compliance quarterly (p3–4).

Page 5 is the Commission's explanatory statement: the 2023 Regulations (notified 27-09-2023, effective 15-11-2023, replacing the 2010 Regulations) had built their trajectory on the MoP's 2022 order; the MoP's RCO notification of 20-10-2023 and its 16-04-2025 clarification superseded the earlier MoP RPO notifications, including the captive-user clarification of 01-10-2019, from 1 April 2024; and CEA resource adequacy work now uses the MoP trajectory (p5). Pages 6–8 reproduce a two-column comparison of the existing and amended provisions, and page 9 closes with the order of the Commission.

Standard name
RPO Regulations
Primary topics
Renewable purchase obligation (RPO / RCO), Renewable energy certificates (REC)

Read with this

The regulation

Amendments and corrections

One more document belongs here and is not on Voltaic: a copy in another language.

Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on tnerc.tn.gov.in ↗

Report an issue with this document