Renewable Energy Purchase Obligation Regulations, 2023

Tamil Nadu Electricity Regulatory Commission (Renewable Energy Purchase Obligation) Regulations, 2023

RegulationDated 26 Oct 2023Published in the Gazette 15 Nov 2023No. TNERC/RPO/01/2023 dated 26-10-2023

2 amendments to it are on Voltaic, the latest dated 26 Aug 2025.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on tnerc.tn.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Tamil Nadu Electricity Regulatory Commission (Renewable Energy Purchase Obligation) Regulations, 2023 replace the State's 2010 RPO regulations and rebuild the whole compliance architecture: who is obligated, how much renewable energy they must buy, how compliance is proved, who administers it, and what happens on default (pp2–6).

Regulations 1–2 (p2) give the short title, bring the regulations into force on Gazette publication, and define the working vocabulary — obligated entity, State Agency, Central Agency, REC certificate, pooled cost of power purchase, power exchange and renewable sources.

Regulation 3 (p3) sets applicability: the distribution licensee; anyone consuming conventional-source electricity through open access or otherwise; and conventional captive generating plants above 1 MVA, whether run for standby/back-up or for normal requirements. Retail consumers of the distribution licensee are carved out. Regulation 4 (p3–4) creates the obligation itself — a uniform RPO for all obligated entities in the licensee's area, measured against the Annexure — and lists the many ways compliance may be demonstrated (own generation, exchange purchases, prosumer net-metered solar, banking, RECs, gross-metered solar), with direction that the Commission may revise the percentages.

Regulations 5–7 (p4–5) tie the State regime to the CERC REC Regulations, 2022, define the State Agency as the SLDC and its accreditation, web-portal, monitoring and reporting duties, and set the conditions under which a renewable generator may obtain accreditation instead of selling at a preferential tariff. Regulation 8 (p5) prescribes the annual pooled-cost petition and the treatment of provisional versus final pooled cost. Regulation 9 (p5–6) sets the default consequences — deposit into a fund, bar on open access, licence breach for the distribution licensee, and penalty under s.142 — with a carry-forward escape on bona fide difficulty. Regulation 10 (p6) repeals the 2010 regulations with savings; regulations 11–14 (p6) provide for removing difficulties, preservation of the Commission's powers, and the statement that these regulations are additional to other regulations and codes.

Annexure-I (pp7–8) is the operative trajectory: year-wise Wind RPO, Hydro Purchase Obligation and Other RPO shares up to FY 2029-30, the conditions and vintage windows under which each category may be met, cross-category offsetting of shortfalls, a separate energy storage obligation trajectory, and the rule that each category must be met separately.

The Explanatory Statement (pp8–9) records why the regulations were made — to give effect to the Ministry of Power's national RPO trajectory of 22 July 2022 (and its corrigendum) and the CERC REC Regulations, 2022 — and states that the RPO on captive and open access consumers remains subject to writ petitions pending before the Madras High Court.

Standard name
RPO Regulations
Primary topics
Renewable purchase obligation (RPO / RCO), Renewable energy certificates (REC), Energy storage obligation

Read with this

One more document belongs here and is not on Voltaic: a copy in another language.

Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of TNERC's website on 29 Sep 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on tnerc.tn.gov.in ↗

Report an issue with this document