CSERC · Chhattisgarh State Electricity Regulatory Commission

Renewable Energy Generation Tariff (Second Amendment) Regulations, 2016

Chhattisgarh State Electricity Regulatory Commission (Terms and conditions for determination of generation tariff and related matters for electricity generated by plants based renewable energy sources) (Second Amendment) Regulations, 201 6

AmendmentDated 21 Mar 2016No. 68/CSERC/2016 dated 21st March 20'16

Replaced by Renewable Energy Generation Tariff Regulations, 2019

See that regulation for the date it took effect and for anything it keeps in force.

Amends the Generation Tariff for Renewable Energy Sources Regulations, 2012.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cserc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Second Amendment to CSERC's 2012 renewable energy tariff regulations, notified in Raipur on 21 March 2016 as No. 68/CSERC/2016. Made under sections 61 and 86 read with 181 of the Electricity Act 2003, its preamble (p1) recites that the Principal Regulations of 2012 set tariff terms for wind, small hydro, biomass and solar stations selling to distribution licensees, ran for the FY 2012-13 to FY 2016-17 control period from Gazette publication on 27 July 2012, and were earlier amended once in 2013. The amendment is deliberately short-lived: clause 1 brings it into force on 1 April 2016 and keeps it in force only to the end of FY 2016-17 (p1).

Clauses 2 and 3 replace the definitions of Firm Power and Non-firm power in regulation 2.1 (p1). Clause 4 rewrites regulation 3.2 to route existing RE projects that hold 20-year-plus long-term PPAs with a distribution licensee and reached COD before 1 April 2012 to the tariff order of 25 December 2011 in Petition No 22 of 2011(T) for fixed charges until that order's tariff period expires, with energy charges under these regulations and a fresh generic or project-specific tariff afterwards (p1–2). Clause 5 extends regulation 7.1(i) to municipal waste based projects pending a separate regulation (p2).

Clause 6 is the substantive block: it replaces regulation 11, granting must-run status to all RE plants except biomass, placing biomass on monthly scheduling with a submission deadline and limited revisions, and setting out load-factor calculation, effective-rate adjustment below the reference load factor, treatment of over-injection, start-up demand charges, monthly netting and three-month banking with a banking charge and peak-hour compensation (p2–3). Clauses 7 and 8 replace the biomass calorific value norms of regulation 44 and the first-year biomass fuel price and indexation reference in regulation 45.1, adding a six-member State-level committee to fix the fifth-year fuel price by independent study (p3). Clause 9 deletes regulation 45.4 (p4).

Standard name
Renewable Energy Tariff Regulations
Primary topics
Renewable energy tariff, Scheduling and despatch, Energy banking

Read with this

6 more documents belong here and are not on Voltaic: 4 copies in another language and 2 corrigenda not held as English text.

Voltaic last read CSERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document CSERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cserc.gov.in ↗

Report an issue with this document