Grid Interactive Renewable Energy Systems Related Matters Regulations [Revision-II], 2024 — First Amendment, 2026

Madhya Pradesh Electricity Regulatory Commission (Grid Interactive Renewable Energy Systems Related Matters) Regulations [Revision-II], 2024(First Amendment) [ARG-39(II)(i) of 2026]

AmendmentDated 18 Jun 2026No.1016/MPERC/2026/ dated 18.06.2026

Amends the Grid Interactive Renewable Energy Systems and Related Matters Regulations [Revision-II], 2024.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on mperc.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

MPERC's First Amendment to its Grid Interactive Renewable Energy Systems Related Matters Regulations [Revision-II], 2024, issued as Notification No.1016/MPERC/2026 dated 18.06.2026 (p1). Section 1 gives the short title, extends the amendment to the whole of Madhya Pradesh and brings it into force on publication in the Madhya Pradesh Gazette (p1) — the Gazette date itself is not printed.

Section 2 inserts into the principal regulations' definition clause a definition of the PM Surya Ghar Muft Bijli Yojna (PMSG:MBY), described as the Government of India scheme launched on 29.02.2024 (p1).

Sections 3 and 4 make targeted changes built around that scheme: three new provisos to Regulation 6 exempt PMSG:MBY net-metering prosumers from the application processing fee, from executing a separate agreement (the agreement is instead appended to the application form and executed online), and from meter-testing fees charged by the licensee (p1–2). Regulation 8A(3)(b)'s internal cross-reference is trimmed and Regulation 8D(4)(d) is reworded from 'group net metering agreement' to 'virtual net metering agreement' (p2).

Section 5 replaces Regulation 9 in full with a new Renewable Purchase Obligation provision under which prosumer generation under net metering, group net metering, gross metering and virtual net metering counts towards the Distribution Licensee's RPO, with a proviso on reading of the renewable generation meter and a fallback to the 2021 RE Regulations (p3).

Standard name
Net Metering and Rooftop Solar
Primary topics
Net metering, Renewable purchase obligation (RPO / RCO), Metering

Read with this

Other copies of these documents (1)

2 more documents belong here and are not on Voltaic: 2 copies in another language.

Voltaic last read MPERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (4 pages). A document MPERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on mperc.in ↗

Report an issue with this document