MPERC · Madhya Pradesh Electricity Regulatory Commission
Grid Interactive Renewable Energy Systems Related Matters Regulations [Revision-II], 2024 — First Amendment, 2026
Madhya Pradesh Electricity Regulatory Commission (Grid Interactive Renewable Energy Systems Related Matters) Regulations [Revision-II], 2024(First Amendment) [ARG-39(II)(i) of 2026]
AmendmentDated 18 Jun 2026No.1016/MPERC/2026/ dated 18.06.2026
Amends the Grid Interactive Renewable Energy Systems and Related Matters Regulations [Revision-II], 2024.
Summary
Summary written by software. Check the regulator's original before you rely on it.
MPERC's First Amendment to its Grid Interactive Renewable Energy Systems Related Matters Regulations [Revision-II], 2024, issued as Notification No.1016/MPERC/2026 dated 18.06.2026 (p1). Section 1 gives the short title, extends the amendment to the whole of Madhya Pradesh and brings it into force on publication in the Madhya Pradesh Gazette (p1) — the Gazette date itself is not printed.
Section 2 inserts into the principal regulations' definition clause a definition of the PM Surya Ghar Muft Bijli Yojna (PMSG:MBY), described as the Government of India scheme launched on 29.02.2024 (p1).
Sections 3 and 4 make targeted changes built around that scheme: three new provisos to Regulation 6 exempt PMSG:MBY net-metering prosumers from the application processing fee, from executing a separate agreement (the agreement is instead appended to the application form and executed online), and from meter-testing fees charged by the licensee (p1–2). Regulation 8A(3)(b)'s internal cross-reference is trimmed and Regulation 8D(4)(d) is reworded from 'group net metering agreement' to 'virtual net metering agreement' (p2).
Section 5 replaces Regulation 9 in full with a new Renewable Purchase Obligation provision under which prosumer generation under net metering, group net metering, gross metering and virtual net metering counts towards the Distribution Licensee's RPO, with a proviso on reading of the renewable generation meter and a fallback to the 2021 RE Regulations (p3).
Read with this
The regulation
Other copies of these documents (1)
2 more documents belong here and are not on Voltaic: 2 copies in another language.
Voltaic last read MPERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (4 pages). A document MPERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.