MPERC · Madhya Pradesh Electricity Regulatory Commission
Grid Interactive Renewable Energy Systems Related Matters Regulations [Revision-II], 2024 — First Amendment, 2026
Madhya Pradesh Electricity Regulatory Commission (Grid Interactive Renewable Energy Systems Related Matters) Regulations [Revision-II], 2024(First Amendment) [ARG-39(II)(i) of 2026]
Amendment · Gazette copyDated 18 Jun 2026No.1016/MPERC/2026/ dated 18th June 2026
The Gazette copy of the Grid Interactive Renewable Energy Systems Related Matters Regulations [Revision-II], 2024 — First Amendment, 2026.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the First Amendment to MPERC's Grid Interactive Renewable Energy Systems Related Matters Regulations [Revision-II], 2024, issued from Bhopal on 18 June 2026 (p5). It is short: it adds a definition, inserts three provisos into Regulation 6, makes two small textual substitutions in Regulation 8, and substitutes Regulation 9 in full (p5–7). The document says it comes into force from the date of publication in the Madhya Pradesh Gazette, but no Gazette date is printed (p5). It extends to the whole State of Madhya Pradesh (p5).
The substantive thrust is to align the principal regulations with the PM Surya Ghar Muft Bijli Yojna (PMSG:MBY), defined as a Government of India scheme launched on 29.02.2024 (p5). For prosumers applying for net metering connections under PMSG:MBY, the amendment bars the distribution licensee from charging the processing fee (p6), removes the need for a separate agreement—the agreement is appended to the application and executed online at application (p6)—and bars any meter-testing fee (p6). It also amends cross-references in Regulation 8A(3)(b) and replaces 'group net metering agreement' with 'virtual net metering agreement' in Regulation 8D(4)(d) (p6). Regulation 9 is replaced with a new RPO provision: energy generated by a prosumer under net metering, group net metering, gross metering and virtual net metering counts toward the distribution licensee's RPO, with provisos for renewable generation meters read by the licensee and for unmeasured units to be treated under the 2021 RE regulations (p7). A stray page 3 fragment lists terms under a Renewable Purchase Obligation heading but is not readable as operative text (p3).
Read with this
The regulation
Amendments and corrections
2 more documents belong here and are not on Voltaic: 2 copies in another language.
Voltaic last read MPERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (4 pages). A document MPERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.